JRE · Joshi Real Estate
Ellington House III  exterior view - Dubai Hills, Dubai - by Ellington
Sold outEllington

Ellington House III

Dubai Hills, Dubai
From
POA
Handover
Q3 2025
Enquire
The Project
From
On request
Status
Sold out
Handover
Q3 2025
Size
from 0 sqft
Residences
-
Construction
82% complete
Furnishing
Unfurnished
Service charge
16 AED/sqft
Buildings
1

Ellington House III is a low-rise residential building by Ellington Properties, situated within Dubai Hills Estate and scheduled for completion in Q3 2025. At 81.9 per cent construction progress, it sits close to handover, occupying one of the more considered addresses in a master-planned district that has matured considerably over the past five years.

# The building and its position in Dubai Hills Estate

Dubai Hills Estate was master-planned by Emaar Properties in partnership with Meraas Holding, and the district now functions as a self-contained urban quarter roughly midway between Downtown Dubai and Dubai Marina. Ellington House III occupies a position within this community that faces the 18-hole championship golf course, placing greenery directly in the sightline rather than borrowed from a distant park.

The building is a single structure. Ellington has built a reputation in Dubai for a particular approach: restrained facades, considered material palettes, and an interior specification that goes further than the market average. That identity carries through here, from the lobby to the communal pool deck.

# Residences, specification and kitchen finish

Specific unit sizes and configurations have not been disclosed in available data, and the development is currently recorded as out of stock, suggesting the majority or entirety of units transacted during the off-plan sales period.

What the specification does confirm is a kitchen designed on an open-plan basis, integrated with the living space rather than separated behind a door. Marble countertops and wood cabinetry form the core material combination, a pairing that reads classically without ageing quickly. Residences are delivered unfurnished, which gives incoming buyers the latitude to commission interiors to their own brief.

Service charges are set at 16 AED per square foot, a figure worth benchmarking against comparable low-rise product in the district before committing to a secondary market purchase.

# Shared amenities and daily life within the building

The communal programme at Ellington House III is oriented around families and active use rather than purely aesthetic amenity.

# For families with children

There are both indoor and outdoor children's play areas, a dedicated kids' pool, and a games table zone. These are practical inclusions, not decorative ones, and they matter to the buyer profile this building attracts.

For adults, the amenities include a fitness studio, swimming pool, outdoor activity area, barbeque area, and a clubhouse. The barbeque area and outdoor activity zone suggest the building was designed with weekend use patterns in mind, particularly for residents who treat the property as a primary residence rather than a short-term investment.

# Distances and daily logistics

The operational case for Dubai Hills Estate rests partly on proximity. GEMS International School is 1.8 kilometres away, a five-minute drive, which places it within the radius that families with school-age children typically treat as a hard requirement. Dubai Hills Golf Club is 1.2 kilometres from the building, reachable in three minutes.

Dubai Hills Mall, at 5.2 kilometres, covers most retail and dining requirements in under ten minutes. The Burj Khalifa and the Burj Al Arab are both within a 15-to-17-minute drive, and Dubai International Airport sits 24.1 kilometres out, approximately 22 minutes by road. For frequent travellers, that is a manageable commute without being the closest option on the market.

# Who this building suits in the current Dubai market

Ellington House III occupies an interesting position for secondary market buyers. The construction risk is effectively gone at 81.9 per cent completion, and Q3 2025 handover means rental income or occupation can begin within months of a purchase completing. The out-of-stock status removes the developer pricing reference, so buyers are working with market-set resale values, which in Dubai Hills have tracked upward through 2023 and 2024 on the back of sustained end-user demand.

For international buyers, particularly those relocating from the UK or Europe with children, the combination of a school inside five minutes, golf immediately adjacent, and a building by a developer with a consistent finish standard addresses the three questions that tend to dominate the shortlisting conversation. It is not a speculative asset play. It is a residence first, with the investment case built around capital preservation in a structurally undersupplied mid-market district.

Structure

Payment plan

Payment plan
Calculator

Payment plan worked out

Enter a target price to see how the payment stages land against your budget.

Stage%AED
Total-AED 0
Discuss this plan with an advisor

Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.

Lifestyle

Amenities

Swimming Pool
Fitness Studio
Indoor & Outdor Kids’ Play Area
Barbeque Area
Outdoor Activity Area
Clubhouse
Kids’ Pool
Games Table Zone
Setting

Location

Set in Dubai Hills, Dubai. Explore more in our Dubai Hills guide.

Nearby
  • GEMS International School1.8 km · 5 min
  • Dubai Hills Mall5.2 km · 9 min
  • Airport24.1 km · 22 min
  • Dubai Hills Golf Club1.2 km · 3 min
  • Burj Arab12 km · 17 min
  • Burj Khalifa13.6 km · 15 min

Distances and times shown are approximate, computed against generalised landmark coordinates and typical traffic conditions. Use them as a guide; actual commute time depends on building exit, district routing and time of day.

Resources

Documents

Escrow number
12825955920005
Service charge
16 AED/sqft
Furnishing
Unfurnished
Construction start
2023-02-07
Construction end
2025-09-30
0
Buildings
1
Readiness
82%
Buildings
  • Building

    Studio, 1, 2, 3 & 4 Bedroom apartments

Parking
  • 3 BR Duplex2 spaces
  • 2 BR Apartment1 space
  • 4 BR Duplex2 spaces
  • 1 BR Apartment1 space
  • Studio Apartment1 space
Questions

Frequently asked

Who is the developer of Ellington House III ?+

Ellington

Where is Ellington House III located?+

Ellington House III is located in Dubai Hills, Dubai, United Arab Emirates.

When is Ellington House III handing over?+

Handover is scheduled for Q3 2025; the project is 82% complete.

What is the price of Ellington House III ?+

Prices at Ellington House III start from AED 0.

Is Ellington House III registered with escrow?+

Yes, Ellington House III has escrow number 12825955920005 with the Dubai Land Department.

Enquire about Ellington House III

Request brochure, availability or a viewing.

A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Ellington House III .

By sending this enquiry you agree to be contacted by a JRE advisor. See our privacy policy.