JRE · Joshi Real Estate
Cove Edition 3

Cove Edition 3

Dubailand Residence Complex, Dubai
From
AED 0
Handover
NOV 2026
Enquire
The Project
From
AED 0
Status
Sold out
Handover
NOV 2026
Size
from 0 sqft
Residences
Construction
18% complete
Furnishing
yes
Service charge
16 AED/sqft
Buildings
1

Cove Edition 3 is a furnished residential building by Imtiaz Development, situated within Dubailand Residence Complex and scheduled for completion in November 2026. The project is currently under construction, with progress recorded at just over 18 per cent, and units are no longer available through the primary market.

# The Building and Its Position in Dubailand Residence Complex

Dubailand Residence Complex occupies the outer ring of Dubai's southern residential belt, a corridor that has absorbed significant mid-market and upper-mid-market development over the past decade. Cove Edition 3 adds a single building to that fabric. The developer's design language draws on contemporary apartment architecture common across this part of the city: clean facades, private outdoor space integrated into the unit typology rather than treated as an afterthought.

At 18 per cent construction progress with a November 2026 handover, the project sits at an early stage. Buyers who entered the market on launch have time before delivery.

# Residences, Layouts and Private Pools

The available unit types span studios, one-bedroom and two-bedroom apartments, with the majority specified to include private swimming pools. That feature is significant: private pools in this price bracket and location are relatively uncommon, and they shift the product away from a standard investment apartment toward something closer to a personal-use or premium-let asset.

All residences are delivered furnished. Kitchens come equipped. Smart home technology is integrated into the specification, though the specific systems involved are not detailed in the public-facing materials.

Service charges are set at 16 AED per square foot per year, a figure that prospective buyers should factor into yield calculations from the outset.

# Shared Amenities and Communal Spaces

The amenity offer within the building covers both active and social functions.

# Leisure and Fitness

An infinity pool sits alongside the private pools at unit level, supplemented by a gym and a children's play area. The outdoor dining and barbecue zone provides a communal gathering space that suits the furnished, lifestyle-oriented positioning of the project.

# Community Infrastructure

A clubhouse, seating and meeting areas, and ground-floor retail spaces round out the programme. These retail units serve immediate daily needs without requiring residents to drive for minor provisions.

# Distances and Daily Connectivity

GEMS First Point School is 1.3 kilometres from the development, the closest significant anchor in the surrounding area and a relevant consideration for families. Downtown Dubai sits roughly 19 kilometres away; Dubai International Airport is approximately 22.7 kilometres, a drive that runs against peak traffic depending on time of day. First Avenue Mall in Motor City and Central Park Mudon are both in the 17 to 19 kilometre range.

The distances reflect the honest reality of Dubailand's geography. This is not a walkable urban location. Residents will depend on a car or, where available, public transport links that continue to develop across this corridor.

# Who This Building is Likely to Suit

Cove Edition 3 is a furnished product with private pools and a service charge that prices in professional management. That combination points to buyers in two broad categories: investors targeting the furnished short-let or long-let market, and end-users drawn to the lifestyle specification at a price point that central Dubai no longer easily supports.

For international buyers from the UK, Europe or Asia approaching Dubai's market with a mid-range budget and an expectation of rental income, Dubailand Residence Complex offers scale and relative affordability. The trade-off is distance from the city's primary employment and leisure centres. Whether that trade-off is acceptable depends on holding strategy and, for end-users, tolerance for car dependency. Cove Edition 3 does not disguise that context; the product simply works within it.

Structure

Payment plan

Post Handover Payment Plan
  1. Step 1
    20%
    On booking
  2. Step 2
    35%
    During construction
  3. Step 3
    15%
    Upon Handover
  4. Step 4
    30%
    2.5% quarterly within 36 month PH
Payment Plan
  1. Step 1
    20%
    On booking
  2. Step 2
    30%
    During construction
  3. Step 3
    50%
    Upon Handover
Calculator

Payment plan worked out

Enter a target price to see how the payment stages land against your budget.

Stage%AED
On booking20%AED 0
During construction35%AED 0
Upon Handover15%AED 0
2.5% quarterly within 36 month PH30%AED 0
Total100%AED 0
Discuss this plan with an advisor

Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.

Lifestyle

Amenities

Private Swimming Pools
Gym
Infinity Pool
Children'S Play Area
Outdoor Dining & Bbq Area
Retail Spaces
Clubhouse
Seating Zone & Meating Area
Setting

Location

Set in Dubailand Residence Complex, Dubai. Explore more in our Dubailand Residence Complex guide.

Nearby
  • GEMS First Point School1.3 km
  • First Avenue Mall - Motor City17.3 km
  • Central Park Mudon18.7 km
  • Mercato Beach24.1 km
  • Dubai International Airport22.7 km
  • Downtown Dubai19.2 km
Resources

Documents

Escrow number
1011225608110040
Service charge
16 AED/sqft
Furnishing
yes
Construction start
2024-12-26
Construction end
2026-11-30
0
Buildings
1
Readiness
18%
Buildings
  • Building

    Studio, 1 & 2 bedroom apartments

Parking
  • 2 BR apartment1 space
  • 1 BR apartment1 space
  • apartment1 space
Questions

Frequently asked

Who is the developer of Cove Edition 3?+

Imtiaz Development

Where is Cove Edition 3 located?+

Cove Edition 3 is located in Dubailand Residence Complex, Dubai, United Arab Emirates.

When is Cove Edition 3 handing over?+

Handover is scheduled for NOV 2026; the project is 18% complete.

What is the price of Cove Edition 3?+

Prices at Cove Edition 3 start from AED 0.

Is Cove Edition 3 registered with escrow?+

Yes, Cove Edition 3 has escrow number 1011225608110040 with the Dubai Land Department.

Enquire about Cove Edition 3

Request brochure, availability or a viewing.

A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Cove Edition 3.

By sending this enquiry you agree to be contacted by a JRE advisor. See our privacy policy.