JRE · Joshi Real Estate
Cove Edition 2

Cove Edition 2

Dubailand Residence Complex, Dubai
From
AED 0
Handover
OCT 2026
Enquire
The Project
From
AED 0
Status
Sold out
Handover
OCT 2026
Size
from 0 sqft
Residences
Construction
24% complete
Furnishing
yes
Service charge
15 AED/sqft
Buildings
1

Cove Edition 2 is a furnished residential building by Imtiaz Development, situated within Dubailand Residence Complex and scheduled for completion in October 2026.

# The Building and Its Position in Dubailand

Dubailand Residence Complex sits in the broader Dubailand district, one of Dubai's more deliberately planned residential corridors. The area has matured steadily over the past decade, attracting families and owner-occupiers drawn by lower land costs, wide roads, and proximity to established villa communities such as The Villa and Arabian Ranches. Cove Edition 2 is a single building within this context, currently under construction at roughly 24 per cent completion.

The development occupies a position that balances suburban quiet with reasonable access to the city's main arteries. The architectural language, based on the developer's materials, draws on contemporary design with an emphasis on greenery at the podium level, giving the building a softer streetscape than the glass-and-steel towers more typical of central Dubai.

# Residences, Furnishing and Specification

The project is delivered fully furnished, a detail that carries practical weight for international buyers who may not be based in Dubai during the construction period. Furnished handovers also tend to simplify the rental process for investors, removing the lead time between completion and tenancy.

Specific unit sizes and configurations have not been published in the available data. The developer's materials reference studios, one-bedroom and two-bedroom layouts, described as combining custom furniture with a restrained tonal palette. Kitchens are fitted and equipped.

The service charge is set at AED 15 per square foot per year, which buyers should factor into yield calculations alongside projected rental income for the sub-district.

# Amenities Across the Podium and Rooftop

The amenity stack covers both active and social use. A fully equipped gym and a kids' swimming pool address the family demographic that Dubailand actively attracts. The private pool and rooftop swimming pools give residents options at different hours of the day and different moods.

# Rooftop as Social Infrastructure

The rooftop level is more developed than a single pool deck. Cabanas, lounges and a BBQ area collectively function as communal entertaining space, a configuration increasingly common in mid-to-upper-tier Dubai buildings as developers respond to demand for outdoor social areas. A club room rounds out the indoor amenity offer.

# Distances and Daily Connectivity

GEMS FirstPoint School in The Villa sits 500 metres from the building, a proximity that will register clearly with families considering the school run. For retail, Villanova Community Mall is approximately 5.2 kilometres away.

Downtown Dubai is 19.8 kilometres from the site, a distance that translates to a 20-to-30-minute drive depending on traffic on Sheikh Mohammed Bin Zayed Road. Dubai International Airport sits at 25.4 kilometres; Jumeirah Beach at 25.5 kilometres. Neither is immediate, but both are within the range that Dubailand residents routinely manage. The district's road infrastructure, built at scale, generally absorbs commuter volume better than older parts of the city.

# Who This Building Suits and Where It Sits in the Market

Cove Edition 2 is presently sold out, which limits immediate acquisition options to the secondary market. That status does signal confirmed buyer demand from the launch phase, and with completion set for October 2026, secondary transactions on off-plan units remain a live possibility before handover.

The project fits a recognisable buyer profile: investors seeking a furnished, lower-entry-point Dubai asset in a family-oriented district, or end-users relocating with children who need immediate access to international schooling. It is not a downtown trophy purchase. It competes instead on value per square foot, a furnished finish, and the quieter residential character of Dubailand, qualities that a specific segment of the international buyer pool actively prioritises over address prestige.

Structure

Payment plan

Payment Plan
Post-handover available
  1. Step 1
    30%
    On booking
  2. Step 2
    20%
    During construction
  3. Step 3
    50%
    Upon Handover
3 Years Post Handover Payment Plan
Post-handover available
  1. Step 1
    20%
    On booking
  2. Step 2
    35%
    During construction
  3. Step 3
    15%
    Upon Handover
  4. Step 4
    30%
    2.5% quarterly during 36 months PH
Calculator

Payment plan worked out

Enter a target price to see how the payment stages land against your budget.

Stage%AED
On booking30%AED 0
During construction20%AED 0
Upon Handover50%AED 0
Total100%AED 0
Discuss this plan with an advisor

Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.

Lifestyle

Amenities

Rooftop Lounges
Fully Equipped Gym
Privatel Pool
Bbq Area
Cabanas
Rooftop Swimming Pools
Club Room
Kids Swimming Pool
Setting

Location

Set in Dubailand Residence Complex, Dubai. Explore more in our Dubailand Residence Complex guide.

Nearby
  • GEMS FirstPoint School, The Villa0.5 km
  • Central park4.8 km
  • Villanova Community Mall5.2 km
  • Downtown Dubai19.8 km
  • Dubai International Airport25.4 km
  • Jumeirah Beach25.5 km
Resources

Documents

Escrow number
1031225608110037
Service charge
15 AED/sqft
Furnishing
yes
Construction start
2024-10-16
Construction end
2026-10-31
0
Buildings
1
Readiness
24%
Buildings
  • Tower

    Studio, 1 & 2 bedroom apartments

Parking
  • 2 BR apartment1 space
  • 1 BR apartment1 space
  • apartment1 space
Questions

Frequently asked

Who is the developer of Cove Edition 2?+

Imtiaz Development

Where is Cove Edition 2 located?+

Cove Edition 2 is located in Dubailand Residence Complex, Dubai, United Arab Emirates.

When is Cove Edition 2 handing over?+

Handover is scheduled for OCT 2026; the project is 24% complete.

What is the price of Cove Edition 2?+

Prices at Cove Edition 2 start from AED 0.

Is Cove Edition 2 registered with escrow?+

Yes, Cove Edition 2 has escrow number 1031225608110037 with the Dubai Land Department.

Enquire about Cove Edition 2

Request brochure, availability or a viewing.

A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Cove Edition 2.

By sending this enquiry you agree to be contacted by a JRE advisor. See our privacy policy.