
- From
- AED 0
- Status
- Sold out
- Handover
- MAY 2028
- Size
- from 0 sqft
- Residences
- —
- Construction
- 0% complete
- Furnishing
- semi furnished
- Buildings
- 1
Alton is a single residential building by Nshama Group, situated within Town Square, the master-planned community in Dubai's southern corridor, with handover scheduled for May 2028. The project offers one-, two-, and three-bedroom apartments on a semi-furnished basis, currently under construction and registered under escrow account 4031224702173091.
# The building and its position within Town Square
Town Square is one of Dubai's more coherent low-rise communities, built around a central park and organised around walkable streets rather than highway frontage. Alton sits at the northern edge of that park, which places it closer to the green heart of the district than many of the community's earlier phases.
The architecture follows a contemporary residential language: clean horizontal lines, warm tonal facades, and large-format windows that face out towards the park. At four percent construction progress as of current reporting, the structure is in its early stages, with completion still roughly three years away.
A single building rather than a cluster, Alton is a contained proposition, which tends to suit buyers who want defined community scale rather than a sprawling podium development.
# Residences, layouts and finish
The apartments span one, two, and three bedrooms. Specific floor areas have not been published, so size comparisons with comparable stock should be drawn from live market data rather than developer materials.
Finishes across the units include porcelain flooring, built-in wardrobes, and German-manufactured kitchen appliances. Master suites carry en-suite bathrooms. All units are delivered semi-furnished, meaning fitted kitchens and wardrobes are included but loose furniture is not.
Natural light is a design priority, with glazing sized to draw the park aspect into the living areas. The dining and living zones are arranged as open-plan configurations, which is standard for this price band in Dubai but executed here with above-average ceiling proportions for the district.
# Amenities on site
The building's amenity floor includes a swimming pool, a fully equipped gym, and a rooftop terrace. Outdoor provision extends to a BBQ area and dedicated children's play areas. A pet washroom is also provided, an increasingly common inclusion in Dubai's mid-market residential stock but still worth noting for buyers relocating with animals.
Direct access to the Main Park at ground level is the strongest amenity argument. For owner-occupiers with children or those who prioritise outdoor space, proximity to the park functions as an extension of the private amenity offer.
# Location, schools and city connections
Town Square Park is approximately one kilometre from the building. The Town Square Community Centre sits within two kilometres. Fairgreen International School, a respected IB curriculum school, is eight kilometres away, making it a practical option for families, though not within walking distance.
The location places residents 29.8 kilometres from Downtown Dubai and 38.9 kilometres from Al Maktoum International Airport, the latter being the more relevant hub as expansion there continues through the decade. Sufouh Beach is 24.7 kilometres by road. The community connects to Sheikh Mohammed Bin Zayed Road, which provides the primary highway access to the rest of the emirate.
# Who this suits, and where it sits in the current Dubai market
Town Square has consistently positioned itself as one of Dubai's more affordable owner-occupier communities, attracting buyers priced out of closer-in districts and investors seeking yield from a growing residential catchment. Alton follows that positioning.
For international buyers, the profile is specific: families or individuals who prioritise green space and community infrastructure over proximity to the financial centre, and who are comfortable with a 2028 delivery timeline. The semi-furnished specification reduces fit-out decisions post-handover, which appeals to overseas purchasers managing a purchase from outside the UAE.
Current availability at Alton is listed as out of stock through JRE's direct inventory, though off-plan resale positions in active projects of this kind do surface. Buyers with interest in the project or the Town Square district more broadly should engage a broker with current access to secondary market listings.
Gallery
Payment plan
- Step 110%On booking
- Step 240%During construction
- Step 350%Upon Handover
Payment plan worked out
Enter a target price to see how the payment stages land against your budget.
| Stage | % | AED |
|---|---|---|
| On booking | 10% | AED 0 |
| During construction | 40% | AED 0 |
| Upon Handover | 50% | AED 0 |
| Total | 100% | AED 0 |
Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.
Amenities







- Fairgreen International School8 km
- Town Square Park1 km
- Town Square Community Center2 km
- Sufouh Beach24.7 km
- Al Maktoum International Airport38.9 km
- Downtown Dubai29.8 km
Documents
- Escrow number
- 4031224702173091
- Furnishing
- semi furnished
- Construction start
- 2025-11-01
- Construction end
- 2028-05-31
- Buildings
- 1
- Readiness
- 0%
- Building
1, 2 & 3 bedroom apartments
- 3 BR apartment2 spaces
- 2 BR apartment1 space
- 1 BR apartment1 space
Frequently asked
Who is the developer of Alton?+
Nshama Group
Where is Alton located?+
Alton is located in Town Square, Dubai, United Arab Emirates.
When is Alton handing over?+
Handover is scheduled for MAY 2028; the project is 0% complete.
What is the price of Alton?+
Prices at Alton start from AED 0.
Is Alton registered with escrow?+
Yes, Alton has escrow number 4031224702173091 with the Dubai Land Department.
Request brochure, availability or a viewing.
A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Alton.


