
- From
- AED 0
- Status
- Sold out
- Handover
- Q4 2025
- Size
- from 0 sqft
- Residences
- —
- Construction
- 51% complete
- Furnishing
- no
- Service charge
- 10 AED/sqft
- Buildings
- 1
AG Central is a residential building by AG Properties, positioned within Dubailand Residence Complex at the intersection of Al Ain Road and Sheikh Mohammed Bin Zayed Road. Scheduled for completion in Q4 2025, the project is currently under construction and sits at roughly 51 per cent progress.
# The building and its position in Dubailand Residence Complex
Dubailand Residence Complex occupies a stretch of eastern Dubai where two of the emirate's principal arterial roads converge. The location gives AG Central a degree of connectivity that belies its suburban address: Sheikh Mohammed Bin Zayed Road runs north towards the airport and south towards Abu Dhabi, while Al Ain Road provides a direct corridor into the city's commercial core.
The building follows a 2B + G + 11 + R configuration, meaning two basement levels, a ground floor, eleven residential storeys, and a roof level. It is a single structure, compact in footprint relative to the master-planned clusters that characterise the broader Dubailand area. The architecture prioritises open-plan layouts and natural light, with private balconies extending the living area outward.
# Residences, layouts and specification
The building houses studios, one-bedroom and two-bedroom apartments. Specific floor areas have not been published, so buyers should request detailed floor plans directly.
Finishes are described as contemporary, using quality materials throughout. Kitchens are unfurnished and do not include appliances, which gives buyers the flexibility to specify their own. Each apartment is fitted with a digital control panel connecting the home's systems to a smartphone or tablet, part of the building's integrated smart home infrastructure.
Service charges are set at 10 AED per square foot annually, a figure worth factoring into yield calculations for investors considering the buy-to-let case.
# Amenities and shared facilities
The building's amenity offer is selective rather than expansive. A swimming pool serves residents at the podium or roof level. Ground-floor retail and food and beverage units provide day-to-day convenience without requiring a car journey for basics.
The smart home system, standard across all units, operates building-wide rather than as an optional upgrade. Reception services are staffed, providing a managed arrival experience.
# Road access, retail and surrounding infrastructure
The dual-road position is the location's principal selling point. Downtown Dubai, Dubai International Airport, Dubai Silicon Oasis and Academic City all fall within an approximate 20-minute drive under normal traffic conditions. Dubai Outlet Mall sits close by, supplementing the in-building retail with a large-format shopping option.
Dubailand as a district has accumulated a substantial range of schools, hospitals and leisure facilities over the past decade, making AG Central viable for end-users with families as much as for investors targeting the rental market.
# Who this building suits and where it sits in the current market
AG Central is not a landmark tower aimed at the upper end of the Dubai market. It is a mid-market residential building offering a specific combination: a strategic road position, smart-home integration as standard, and proximity to key employment and education hubs, at a price point the developer has positioned to attract both owner-occupiers and yield-focused investors.
The project is currently sold out. Buyers seeking a similar specification in the Dubailand corridor should monitor secondary market listings as handover approaches in late 2025. At 51 per cent construction progress, the building is past its structural midpoint, which reduces delivery risk for those tracking resale opportunities.
Gallery
Payment plan
- Step 111%On booking
- Step 247%During construction
- Step 342%During 42 months PH
Payment plan worked out
Enter a target price to see how the payment stages land against your budget.
| Stage | % | AED |
|---|---|---|
| On booking | 11% | AED 0 |
| During construction | 47% | AED 0 |
| During 42 months PH | 42% | AED 0 |
| Total | 100% | AED 0 |
Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.
Amenities



Location
Set in Dubailand Residence Complex, Dubai. Explore more in our Dubailand Residence Complex guide.
Documents
- Escrow number
- 0205803195811
- Service charge
- 10 AED/sqft
- Furnishing
- no
- Construction start
- 2023-10-31
- Construction end
- 2025-12-31
- Buildings
- 1
- Readiness
- 51%
- Tower
Studio, 1 & 2 bedroom apartments
- 2 BR apartment1 space
- 1 BR apartment1 space
- apartment1 space
Frequently asked
Who is the developer of AG Central?+
AG Properties
Where is AG Central located?+
AG Central is located in Dubailand Residence Complex, Dubai, United Arab Emirates.
When is AG Central handing over?+
Handover is scheduled for Q4 2025; the project is 51% complete.
What is the price of AG Central?+
Prices at AG Central start from AED 0.
Is AG Central registered with escrow?+
Yes, AG Central has escrow number 0205803195811 with the Dubai Land Department.
Request brochure, availability or a viewing.
A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for AG Central.


