JRE · Joshi Real Estate
Yas Riva exterior view - Al Raha Beach, Dubai - by ALDAR
Sold outALDAR

Yas Riva

Al Raha Beach, Dubai
From
AED 0
Handover
Q3 2028
Enquire
The Project
From
AED 0
Status
Sold out
Handover
Q3 2028
Size
from 0 sqft
Residences
Construction
0% complete
Furnishing
only kitchen
Service charge
5.9 AED/sqft
Buildings
1

Yas Riva is a residential development by Aldar Properties, situated within the Al Raha Beach district on the Abu Dhabi–Dubai corridor, with completion scheduled for Q3 2028. Currently under construction, the project delivers a single building of villa and apartment residences, finished with equipped kitchens and a choice of light or dark interior palettes.

# The building and its position within Al Raha Beach

Al Raha Beach occupies a stretch of coastline that sits between Abu Dhabi city and the emirate's expanding leisure corridor along Yas Island. The area has matured steadily over the past decade into one of the capital's more considered waterfront addresses, drawing residents who want proximity to Abu Dhabi's infrastructure without the density of the urban core.

Yas Riva adds a single building to that fabric. Aldar, the Abu Dhabi-listed developer behind projects such as Yas Acres and Saadiyat Grove, has oriented the design around the relationship between natural light and the water's edge, using organic material choices to soften the facade. The result reads as contemporary without the cold geometry that defines much of the region's recent residential output.

The project is already under construction, with the service charge set at 5.9 AED per square foot.

# Residences, interiors and finish

Specific unit configurations and sizes have not been disclosed publicly at this stage. What is confirmed is that residences come with kitchens fitted as standard, and buyers can choose between light and dark finish schemes, giving a degree of personalisation within the fixed specification.

The kitchen-equipped standard is a practical baseline for international buyers who intend to lease the property in the near term. For owner-occupiers, the finish options allow some differentiation without the complexity of a full bespoke specification process.

# Amenity provision across the development

The communal offering at Yas Riva is notably broad for a single-building project. The health and wellness facilities alone span a spa, steam room, dedicated yoga studio and treatment area, with separate workout and fitness zones keeping structured exercise distinct from recovery spaces.

Active recreation is addressed with two padel courts and a climbing play structure. The outdoor sequence includes a wavy lawn, sand playground, relaxation spot and an outdoor amphitheatre, which points toward a community programme rather than static green space. F&B seating and a community pavilion complete the ground-level offering.

The range suggests Aldar is positioning the building to attract families as much as couples or single professionals.

# Location, access and the surrounding area

Yas Park Views sits 1.6 kilometres from the development. SABIS International School, one of the more established international curriculum schools in the capital's suburbs, is approximately 6.8 kilometres away, a meaningful proximity for families with school-age children.

Abu Dhabi Airport Terminal A is 10.3 kilometres from the site, a distance that most residents would cover in under fifteen minutes outside peak hours. Yas Beach is 11.8 kilometres away, and the Yas Island Community Market, which operates as a periodic local retail and social anchor, is around 7.6 kilometres.

The location suits buyers who travel frequently through Abu Dhabi Airport and want a residential base that keeps both the capital's amenities and the entertainment belt of Yas Island within a short drive.

# Who Yas Riva suits in the current Abu Dhabi market

Abu Dhabi has attracted considerably more international buyer attention since the emirate extended its freehold eligibility zones, and Al Raha Beach sits within those designated areas. For buyers comparing the two emirates, the capital's price points have historically offered more square footage per dirham than equivalent Dubai waterfront addresses, though that gap has narrowed since 2022.

Yas Riva is currently out of stock, which positions it as a project to track rather than transact on immediately. Buyers who registered interest early have already absorbed the primary market allocation. For those still considering the corridor, the development functions as a useful benchmark: an Aldar product, waterfront-adjacent, with a 2028 delivery that aligns with Abu Dhabi's continued infrastructure build-out around the Yas Island and Al Raha axis. Secondary market availability, if and when it emerges, will be the next logical moment to assess pricing relative to comparable stock.

Structure

Payment plan

Payment Plan
  1. Step 1
    5%
    On booking
  2. Step 2
    45%
    During construction
  3. Step 3
    50%
    Upon Handover
Calculator

Payment plan worked out

Enter a target price to see how the payment stages land against your budget.

Stage%AED
On booking5%AED 0
During construction45%AED 0
Upon Handover50%AED 0
Total100%AED 0
Discuss this plan with an advisor

Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.

Lifestyle

Amenities

Community Pavilion
Workout Area
Climbing Play
F&B Seating
2 Padel Courts
Relaxation Spot
Fitness Area
Spa
Steam Room
Sand Playground
Wavy Lawn
Treatment Area
Yoga Studio
Outdoor Amphitheater
Table Tennis
Meditation Area
Swimming Pools
Splash Pad
Outdoor Gym
Forte Fitness Centre
Water Play
Community-Wide Cycle Track
Jogging Track
Bbq & Picnic Areas
Pocket Parks
Kids Play Areas
The View Clubhouse
Sauna
Setting

Location

Set in Al Raha Beach, Dubai. Explore more in our Al Raha Beach guide.

Nearby
  • Yas Park Views1.6 km
  • SABIS International School6.8 km
  • Yas Island Community Market7.6 km
  • Abu Dhabi Airport Terminal A10.3 km
  • Yas Beach11.8 km
Resources

Documents

Service charge
5.9 AED/sqft
Furnishing
only kitchen
Construction start
2024-09-23
Construction end
2028-09-30
0
Buildings
1
Readiness
0%
Buildings
  • Villas

    4, 5 & 6 bedroom villas

Parking
  • 4 BR villas2 spaces
  • 6 BR villas3 spaces
  • 5 BR villas2 spaces
Questions

Frequently asked

Who is the developer of Yas Riva?+

ALDAR

Where is Yas Riva located?+

Yas Riva is located in Al Raha Beach, Dubai, United Arab Emirates.

When is Yas Riva handing over?+

Handover is scheduled for Q3 2028; the project is 0% complete.

What is the price of Yas Riva?+

Prices at Yas Riva start from AED 0.

Is Yas Riva registered with escrow?+

JRE will confirm escrow registration on request.

Enquire about Yas Riva

Request brochure, availability or a viewing.

A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Yas Riva.

By sending this enquiry you agree to be contacted by a JRE advisor. See our privacy policy.