
- From
- AED 0
- Status
- Sold out
- Handover
- DEC 2026
- Size
- from 0 sqft
- Residences
- —
- Construction
- 65% complete
- Furnishing
- no
- Service charge
- 12 AED/sqft
- Buildings
- 1
South Living is a residential apartment tower by Dubai South Developers, positioned within the Dubai South Residential District and due for handover in December 2026. Construction is now 65 per cent complete.
# The Tower and Its Position in Dubai South
Dubai South is a planned district built around Al Maktoum International Airport in the southern stretch of the emirate. Its residential quarter has grown steadily since the Expo 2020 site brought lasting infrastructure to the area, including road upgrades, retail and a reconfigured public realm that now anchors several new communities. South Living sits at the centre of that residential grid.
The project comprises a single building. Its frontage addresses Expo Road, which is the primary arterial corridor through this part of the district. Daily amenities, a community park and fuel facilities are all within walking distance, which matters in a district that was, until recently, better known for logistics than for liveable neighbourhoods.
The double-height entrance lobby includes a waterfall wall feature. It is the kind of gesture that signals where the developer's priorities lie: arrival sequence over raw specification.
# Residences, Layouts and Finish
The tower offers studios, one-bedroom, two-bedroom and three-bedroom apartments. Specific floor areas and pricing are not currently published, as the project is listed as out of stock.
Units are delivered unfurnished, with modern finishes and what the developer describes as high-quality materials throughout. Apartments face the surrounding community, and the layouts are designed with family occupation in mind rather than short-term letting configurations. The service charge is set at 12 AED per square foot annually, consistent with mid-tier residential buildings across Dubai's newer districts.
# Amenity Provision and the Focus on Family Living
The amenity offer is modest in scale but coherent in intent. A lap pool sits alongside a children's pool and a dedicated play area, covering both adult fitness and younger residents in a single zone.
# Wellness and quieter corners
A gym is paired with yoga and meditation space. These two functions are increasingly common in Dubai residential buildings, but their combination here reflects a deliberate positioning towards health-conscious owner-occupiers rather than the short-stay rental market. The library and gazebo seating areas are the less expected inclusions: they suggest a community designed for residents who intend to spend time in the building, not just sleep in it.
# Location: Al Maktoum Airport and the Expo Legacy District
Al Maktoum International Airport is the defining infrastructure asset of this part of Dubai. Its expansion has been a long-running project, and its eventual full operation will make Dubai South one of the most connected residential addresses in the emirate by proximity alone.
The former Expo 2020 site, now branded as a legacy district, sits close by. It contains retail, cultural venues and green space that effectively expand the amenity catchment for South Living residents beyond what the building itself provides. Expo Road, on which the tower fronts, runs directly into that broader network.
# Who This Project Suits and Where It Sits in the Market
South Living is not a trophy address. It does not compete with the waterfront towers of Dubai Marina or the density of Downtown. What it offers is a straightforward value proposition in a district that is still maturing: a completed family apartment in a planned community, close to an airport that will eventually reshape the southern half of Dubai's residential geography.
For buyers from the GCC or South Asia already familiar with Dubai South's trajectory, the appeal is clear. For European and British buyers, it requires a longer-term view: the district's fundamentals are sound, but the lifestyle it offers today is quieter and more utilitarian than the central districts. The December 2026 handover and current construction progress give buyers reasonable confidence in delivery timelines. At a service charge of 12 AED per square foot, ongoing holding costs are calculable and conservative.
Gallery
Payment plan
- Step 15%On booking
- Step 255%During construction
- Step 316%Upon Handover
- Step 424%During 24 months PH
Payment plan worked out
Enter a target price to see how the payment stages land against your budget.
| Stage | % | AED |
|---|---|---|
| On booking | 5% | AED 0 |
| During construction | 55% | AED 0 |
| Upon Handover | 16% | AED 0 |
| During 24 months PH | 24% | AED 0 |
| Total | 100% | AED 0 |
Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.
Amenities




Documents
- Escrow number
- 10613405342001
- Service charge
- 12 AED/sqft
- Furnishing
- no
- Construction start
- 2018-01-05
- Construction end
- 2026-12-31
- Buildings
- 1
- Readiness
- 65%
- Building
Studio, 1, 2 & 3 bedroom apartments
- 3 BR apartment2 spaces
- 2 BR apartment1 space
- 1 BR apartment1 space
- apartment1 space
Frequently asked
Who is the developer of South Living?+
Dubai South Developers
Where is South Living located?+
South Living is located in Dubai South, Dubai, United Arab Emirates.
When is South Living handing over?+
Handover is scheduled for DEC 2026; the project is 65% complete.
What is the price of South Living?+
Prices at South Living start from AED 0.
Is South Living registered with escrow?+
Yes, South Living has escrow number 10613405342001 with the Dubai Land Department.
Related residences
Request brochure, availability or a viewing.
A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for South Living.


