- From
- AED 0
- Status
- Sold out
- Handover
- DEC 2027
- Size
- from 0 sqft
- Residences
- —
- Construction
- 72% complete
- Furnishing
- no
- Service charge
- 3-4 AED/sqft
- Buildings
- 1
Park Gate is a villa community by Emaar Properties, situated at the entrance of Dubai Hills Estate within Mohammed Bin Rashid City. Scheduled for completion in December 2027, the project is currently 71.58 per cent constructed and represents the final villa release within the broader Dubai Hills masterplan.
# The building and its position within Dubai Hills Estate
Dubai Hills Estate sits between Downtown Dubai and Dubai Marina, flanked by Al Khail Road, which gives the district its particular appeal to buyers who want proximity to the city's commercial and cultural centres without living inside them. Park Gate occupies the main entrance to this masterplan, a position that carries both practical and symbolic weight.
The community comprises a single building classification rather than a high-rise tower. Architecturally, the villas follow a contemporary minimalist language: clean lines, restrained materiality, and an emphasis on the relationship between interior volume and the surrounding parkland. The approach is deliberate rather than decorative.
# Residences: four and five-bedroom villas
Park Gate offers two villa configurations. Four-bedroom homes are sized for families seeking a manageable footprint without sacrificing proportion; five-bedroom units extend the living programme further, with generously scaled common areas and additional private space.
Each villa is unfurnished, which suits buyers who prefer to specify their own interiors. Floor-to-ceiling glazing runs throughout, and open-plan layouts characterise the main living floors. Balconies and roof terraces face onto linear parks and communal amenity zones, so outdoor space reads as an extension of the interior rather than an afterthought. The neutral palette and natural-texture finishes visible in the developer's materials suggest a specification calibrated for longevity over trend.
# Amenities on-site
# Sport and leisure
Residents have access to swimming pools, a padel court, table tennis, and fitness facilities. BBQ areas and children's play areas are distributed across the community.
Healthcare and educational facilities are referenced in the project brief as proximate to the development, which reflects the broader Dubai Hills masterplan infrastructure rather than amenities located within the Park Gate gates specifically.
# Location, access and the Dubai Hills context
Al Khail Road gives Park Gate direct connectivity to Sheikh Zayed Road and, from there, to Dubai International Airport, Downtown Dubai, and the Dubai Marina cluster. For buyers arriving from Europe or Asia, that airport link tends to register early in any decision.
Dubai Hills Mall, the 18-hole championship golf course at the heart of the estate, and the Central Park greenway are all within the masterplan boundary. These are shared community assets rather than Park Gate exclusives, but their proximity shapes the everyday quality of life for residents throughout the district.
# Who Park Gate suits, and where it sits in the 2025 villa market
The Dubai villa market has tightened considerably across gated communities with Emaar backing, and projects offering land, private outdoor space, and a master-planned setting have consistently attracted demand from European and GCC buyers relocating families rather than speculating on yield.
Park Gate is listed as out of stock, which signals either full absorption at the initial launch or a pause ahead of a further release phase. For buyers tracking the project, the escrow registration (0204806436136) is verifiable through the Dubai Land Department. Service charges are projected at 3 to 4 AED per square foot annually, a figure broadly in line with comparable Emaar villa communities.
At 71.58 per cent complete, the construction risk is materially reduced. December 2027 delivery gives buyers sufficient runway to plan fit-out and relocation without the longer uncertainty window that earlier off-plan phases carry.
Gallery
Payment plan
- Step 120%On booking
- Step 270%During construction
- Step 310%Upon Handover
Payment plan worked out
Enter a target price to see how the payment stages land against your budget.
| Stage | % | AED |
|---|---|---|
| On booking | 20% | AED 0 |
| During construction | 70% | AED 0 |
| Upon Handover | 10% | AED 0 |
| Total | 100% | AED 0 |
Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.
Amenities






Documents
- Escrow number
- 0204806436136
- Service charge
- 3-4 AED/sqft
- Furnishing
- no
- Construction start
- 2024-05-03
- Construction end
- 2027-12-31
- Buildings
- 1
- Readiness
- 72%
- Villas
4 & 5 bedroom villas
- 4 BR villas2 spaces
- 5 BR villas2 spaces
Frequently asked
Who is the developer of Park Gate?+
Emaar
Where is Park Gate located?+
Park Gate is located in Dubai Hills, Dubai, United Arab Emirates.
When is Park Gate handing over?+
Handover is scheduled for DEC 2027; the project is 72% complete.
What is the price of Park Gate?+
Prices at Park Gate start from AED 0.
Is Park Gate registered with escrow?+
Yes, Park Gate has escrow number 0204806436136 with the Dubai Land Department.
Request brochure, availability or a viewing.
A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Park Gate.



