- From
- AED 0
- Status
- Sold out
- Handover
- JUL 2027
- Size
- from 0 sqft
- Residences
- —
- Construction
- 72% complete
- Furnishing
- no
- Service charge
- 3-4 AED/sqft
- Buildings
- 1
Nima is a townhouse community by Emaar within The Valley, a master-planned residential district positioned along the Dubai–Al Ain Road, scheduled for completion in July 2027.
# The Valley and where Nima sits within it
The Valley is one of Emaar's more considered suburban propositions: a low-density, largely horizontal development conceived around parks, open space and a walkable town centre rather than the vertical density that defines much of Dubai's newer supply. Nima occupies a position within that broader community, drawing directly on its shared infrastructure.
The project is currently 72 per cent complete, with handover set for mid-2027. For buyers tracking construction progress, that figure places it well into its final phase of delivery.
# Townhouse layouts, architecture and specification
Nima offers three-bedroom and four-bedroom townhouses across two architectural variants, referred to by the developer as Canna and Cedar. The distinction is stylistic rather than structural, giving buyers a degree of choice at the point of purchase without altering the fundamental layout logic.
Floor-to-ceiling windows feature throughout, which in a low-rise townhouse context means meaningful daylighting across living floors rather than the gestural glazing that appears in many mid-range apartments. The developer references locally sourced materials as part of the design philosophy. Residences are delivered unfurnished.
Service charges are estimated at 3–4 AED per square foot annually, which is modest relative to branded or serviced product elsewhere in the market.
# Amenities within the community
# What the site contains
The amenity programme is community-scale. Residents have access to a swimming pool, a gym, and a dedicated kids' play area labelled Kids' Dale, alongside general children's play zones. Sport courts and both bicycle and running tracks are included in the site plan.
The Town Center component is the anchor of the broader Valley masterplan. It functions as the commercial and civic heart of the district, providing retail and dining access without requiring residents to drive out to a mall.
# Connectivity and the Dubai–Al Ain Road corridor
The Valley sits on the Dubai–Al Ain Road (E66), which provides a direct artery into central Dubai. The drive to Downtown Dubai runs to roughly 25 minutes under normal traffic conditions. Dubai International Airport is accessible via the same corridor.
It is worth being clear about what this location is and is not. The Valley is a suburban community, and buyers should approach it as such. The trade-off is space, greenery and lower density in exchange for the kind of immediate urban walkability found in, say, Business Bay or Jumeirah. For families or buyers prioritising a residential rather than investment-yield profile, that equation is often exactly right.
# Who Nima suits, and where it stands in the current market
Emaar's decision to build out The Valley as a townhouse-led, park-anchored community places Nima in a specific segment of Dubai's supply: mid-to-large family homes with outdoor space, modest running costs, and the credibility of a tier-one developer behind the delivery.
At 72 per cent construction progress with a July 2027 completion date, the project carries a lower execution risk than early-stage launches. For international buyers, particularly those in the UK or Europe familiar with developer reputations and phased suburban masterplans, Emaar's track record in delivering comparable communities on schedule is a reasonable basis for confidence.
The community positioning, the townhouse typology, and the family-oriented amenity mix make Nima coherent as a primary residence rather than a short-let play. Buyers seeking yield-driven product in high-turnover locations will find better-suited options elsewhere in the emirate.
Gallery
Payment plan
- Step 110%On booking
- Step 280%During construction
- Step 310%Upon Handover
Payment plan worked out
Enter a target price to see how the payment stages land against your budget.
| Stage | % | AED |
|---|---|---|
| On booking | 10% | AED 0 |
| During construction | 80% | AED 0 |
| Upon Handover | 10% | AED 0 |
| Total | 100% | AED 0 |
Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.
Amenities







Documents
- Escrow number
- 0205345068519
- Service charge
- 3-4 AED/sqft
- Furnishing
- no
- Construction start
- 2023-11-17
- Construction end
- 2027-07-31
- Buildings
- 1
- Readiness
- 72%
- Townhouses
3 & 4 bedroom townhouses
- 3 BR townhouses2 spaces
- 4 BR townhouses2 spaces
Frequently asked
Who is the developer of Nima?+
Emaar
Where is Nima located?+
Nima is located in The Valley, Dubai, United Arab Emirates.
When is Nima handing over?+
Handover is scheduled for JUL 2027; the project is 72% complete.
What is the price of Nima?+
Prices at Nima start from AED 0.
Is Nima registered with escrow?+
Yes, Nima has escrow number 0205345068519 with the Dubai Land Department.
Request brochure, availability or a viewing.
A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Nima.



