JRE · Joshi Real Estate
Nad Al Sheba Gardens Phase 9
On saleMeraas

Nad Al Sheba Gardens Phase 9

Wadi Al Safa 3, Dubai
From
AED 0
Handover
APR 2029
Enquire
The Project
From
AED 0
Status
On sale
Handover
APR 2029
Size
from 0 sqft
Residences
Construction
0% complete
Furnishing
no
Service charge
5 AED/sqft
Buildings
1

Nad Al Sheba Gardens Phase 9 is a gated villa community by Meraas, located in Wadi Al Safa 3 on the southern side of Dubai Creek, with handover scheduled for April 2029. The project is currently under construction, with approximately 22 per cent of the build complete.

# A low-rise community in a district shaped by old Dubai geography

Nad Al Sheba sits in a part of the city that predates its glass skyline. The district occupies the corridor between Al Quoz, Meydan and Ras Al Khor, close to where residential Dubai first extended south from the Creek. That context matters architecturally. Phase 9 follows the pattern established in earlier stages of the Nad Al Sheba Gardens masterplan: low-rise villas arranged across landscaped grounds, prioritising horizontal space over vertical density.

Meraas has been the developer behind several of Dubai's more design-conscious communities, and the approach here reflects that track record. Natural materials, curated greenery and winding internal pathways shape the character of the neighbourhood rather than a conventional grid of plots.

# Villas from four to seven bedrooms, with double-height living and integrated lifts

The residences range from four-bedroom to seven-bedroom villas. Each configuration is built around an open-plan interior logic, with double-height living areas creating volume in the principal rooms. Terraces are generous, and selected units include integrated lifts, a detail that makes seven-bedroom homes more practical as multi-generational properties.

Kitchens come equipped. Finishes are unfurnished, which gives buyers flexibility on specification, though Meraas has used warm material palettes and natural tones throughout to establish a base quality level. Indoor-outdoor connectivity is considered at the floor-plan stage, not retrofitted.

The service charge is set at 5 AED per square foot, which is competitive for a gated community with this breadth of shared facilities.

# Community infrastructure built around movement and outdoor life

# Sport, water and social space

The amenity list at Nad Al Sheba Gardens Phase 9 is broad. There is a central lagoon and a wave pool, a yoga lawn, dedicated running tracks, and a range of sports facilities covering basketball, tennis and padel. An event lawn paired with an open-air amphitheatre gives the community a social infrastructure beyond sport. There is also a dog park, a detail that signals the developer's understanding of the buyer profile.

Children's play areas are distributed across the grounds. The overall approach positions the community as something closer to a resort-style campus than a conventional residential estate, without the transience that phrase usually implies.

# Eleven kilometres from Downtown, two from the Meydan corridor

The Nad Al Sheba Gardens site places residents within 1.8 kilometres of The Square retail and dining hub within the broader Nad Al Sheba Gardens development. Kinder Castle Nursery Meydan is 2.1 kilometres away, a practical consideration for families with young children.

Al Khail Mall sits 8.9 kilometres out. Downtown Dubai is 11.5 kilometres from the site, roughly a 15-minute drive in normal traffic along Al Khail Road. Dubai International Airport is 23.3 kilometres, placing the community within reasonable reach for frequent travellers without the constant aircraft noise that affects properties closer to the flight paths. Mercato Beach on Jumeirah is 14.2 kilometres.

The Meydan Racecourse is the area's best-known landmark, and its presence helps fix the postcode in the minds of buyers who know Dubai, particularly those from the GCC with a cultural connection to the site.

# The case for Phase 9 among buyers seeking scale and permanence

Buyers drawn to Nad Al Sheba Gardens Phase 9 tend to fall into two groups. The first is the Dubai-based family upsizing from an apartment or smaller villa in Business Bay or JVC, attracted by the combination of school proximity, space and community infrastructure. The second is the international buyer, typically from the UK, continental Europe or the GCC, looking for a main residence or long-term hold in a mid-city location that does not carry the premium of the Palm or Emirates Hills.

At 22 per cent construction progress with delivery in April 2029, the project sits at a stage where buyers can still negotiate on unit selection without the rushed timeline pressure of near-completion stock. Meraas's delivery track record on previous phases of the same masterplan provides a degree of confidence that more speculative off-plan projects in newer districts cannot yet offer. The escrow account is registered under number 1015865423601.

Structure

Payment plan

Payment Plan for 6 & 7 bedroom villas
  1. Step 1
    20%
    On booking
  2. Step 2
    40%
    During construction
  3. Step 3
    40%
    Upon Handover
Payment Plan for 4 & 5 bedroom villas
  1. Step 1
    20%
    On booking
  2. Step 2
    60%
    During construction
  3. Step 3
    20%
    Upon Handover
Calculator

Payment plan worked out

Enter a target price to see how the payment stages land against your budget.

Stage%AED
On booking20%AED 0
During construction40%AED 0
Upon Handover40%AED 0
Total100%AED 0
Discuss this plan with an advisor

Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.

Lifestyle

Amenities

Yoga Lawn
Running Tracks
Lagoon
Sports Facilities
Event Lawn & Amphitheatre
Dog Park
Wave Pool
Kids Playing Areas
Setting

Location

Set in Wadi Al Safa 3, Dubai. Explore more in our Wadi Al Safa 3 guide.

Nearby
  • The Square Nad Al Sheba Gardens1.8 km
  • Kinder Castle Nursery Meydan2.1 km
  • Al Khail Mall8.9 km
  • Downtown Dubai11.5 km
  • Mercato Beach14.2 km
  • Dubai International Airport23.3 km
Resources

Documents

Escrow number
1015865423601
Service charge
5 AED/sqft
Furnishing
no
Construction start
2025-09-01
Construction end
2029-04-30
0
Buildings
1
Readiness
0%
Buildings
  • Villas

    4, 5, 6 & 7 bedroom villas

Parking
  • 4 BR villas2 spaces
  • 7 BR villas4 spaces
  • 5 BR villas3 spaces
  • 6 BR villas3 spaces
Questions

Frequently asked

Who is the developer of Nad Al Sheba Gardens Phase 9?+

Meraas

Where is Nad Al Sheba Gardens Phase 9 located?+

Nad Al Sheba Gardens Phase 9 is located in Wadi Al Safa 3, Dubai, United Arab Emirates.

When is Nad Al Sheba Gardens Phase 9 handing over?+

Handover is scheduled for APR 2029; the project is 0% complete.

What is the price of Nad Al Sheba Gardens Phase 9?+

Prices at Nad Al Sheba Gardens Phase 9 start from AED 0.

Is Nad Al Sheba Gardens Phase 9 registered with escrow?+

Yes, Nad Al Sheba Gardens Phase 9 has escrow number 1015865423601 with the Dubai Land Department.

Enquire about Nad Al Sheba Gardens Phase 9

Request brochure, availability or a viewing.

A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Nad Al Sheba Gardens Phase 9.

By sending this enquiry you agree to be contacted by a JRE advisor. See our privacy policy.