Film
- From
- On request
- Status
- Sold out
- Handover
- Q2 2022
- Size
- from 0 sqft
- Residences
- -
- Construction
- 100% complete
- Furnishing
- Unfurnished
- Service charge
- 6 AED/sqft
- Buildings
- 1
Marbella Villas is a completed villa and townhouse community on Hayat Island, Mina Al Arab, developed by RAK Properties and handed over in Q2 2022. The project sits within Ras Al Khaimah's flagship mixed-use waterfront district, offering two-to-five-bedroom homes directly adjacent to the InterContinental Hotel resort.
# The community on Hayat Island
Mina Al Arab is RAK Properties' primary coastal development, and Hayat Island forms its most prominent residential address. The island sits at the edge of the Arabian Sea, with the broader district built around a network of promenades, cycle paths, parks and public plazas that connect the residential precincts to retail and dining along the water's edge.
Marbella Villas occupies a gated section of Hayat Island, immediately beside the InterContinental Hotel's beach resort and spa. That adjacency matters: residents gain proximity to hotel-grade beachfront infrastructure without the transience of a serviced-residence model. The architectural language draws on Mediterranean influences filtered through a Gulf context, a combination visible in the low-rise massing, pale facades and garden-forward plot layouts.
# Residences, layouts and outdoor space
The homes range from two to five bedrooms, encompassing both villas and townhouses. Each residence includes a contemporary kitchen, dedicated maid's and driver's rooms, a private garden and parking provision. The absence of furnishing means buyers select and install their own interiors, which suits end-users and investors alike who prefer to specify finishes independently.
Service charges are set at 6 AED per square foot annually. That rate, common for low-rise villa communities in emerging northern Emirates destinations, reflects the managed communal infrastructure rather than a high-rise service model.
# On-site amenities
The community provides a focused set of shared facilities: waterfront sun loungers, swimming pools, a gym and a children's play area. The promenade fronting the Arabian Sea extends the usable outdoor space considerably, supplementing what each villa's private garden provides.
The amenity list is deliberate rather than exhaustive. RAK Properties positioned Marbella Villas against the wider Hayat Island public realm, which includes seafront dining, retail and events spaces, rather than duplicating those functions within the gated boundary.
# Connections and the surrounding district
The Lagoon, a water-leisure destination within Mina Al Arab, sits 1.6 kilometres away and is reachable in around four minutes by car. Al Jazeera Beach 2 is approximately 4.5 kilometres distant, a seven-minute drive, offering an alternative coastal stretch. Al Jazira Al Hamra Garden, one of the emirate's heritage sites, is 5.9 kilometres from the community.
School Al Jazeerah Al Hamra is 3.3 kilometres away, a six-minute drive, which covers one of the more practical requirements for families evaluating primary schooling proximity. Sharjah International Airport is roughly 75 kilometres south, approximately 47 minutes by road, placing Marbella Villas firmly within the Ras Al Khaimah orbit rather than acting as a commuter address for Dubai or Sharjah.
# A completed asset in a market where delivery risk has defined the decade
For buyers who have watched Dubai off-plan commitments stretch across multiple delayed cycles, the straightforward appeal of Marbella Villas is that it already exists. Completion came in Q2 2022, construction is at 100 per cent, and the question is purely one of resale or secondary acquisition rather than speculative timing.
The profile fits a particular buyer: someone allocating to the northern Emirates for lifestyle or yield reasons, comfortable with RAK's lower price-per-square-foot relative to Dubai, and prioritising a genuine waterfront position over urban density. The community is out of stock from the developer, so any transaction proceeds through the secondary market, where completed villa stock in Mina Al Arab has attracted sustained interest from GCC buyers seeking a weekend or short-let asset within a two-hour catchment of Dubai.
Gallery
Project videos
Supporting films, shorts and lifestyle clips from the developer's official channel. Tap any tile to open the full embed.
FilmBuild progress
Construction updates from the developer, newest first. Track structural progress on site without waiting for the next brochure cycle.
- October 2024
Mina | Marbella Villas II Construction Update | October 2024
- August 2024
Mina | Marbella Villas II Construction Update | August 2024
- June 2024
Mina | Marbella Villas II Construction Update | June 2024
- May 2024
Mina | Marbella Villas II Construction Update | May 2024
- April 2024
Mina | Marbella Villas II Construction Update | April 2024
- February 2024
Mina | Marbella Villas II Construction Update | February 2024
- December 2023
Mina | Marbella Villas II Construction Update | December 2023
- November 2023
Mina | Marbella Villas II Construction Update | November 2023
- October 2023
Mina | Marbella Villas II Construction Update | October 2023
- September 2023
Mina | Marbella Villas II Construction Update | September 2023
- June 2023
Mina | Marbella Villas II Construction Update | June 2023
- October 2021
Mina | Marbella Villas Construction Update | October 2021
- August 2021
Mina | Marbella Villas Construction Update | August 2021
- July 2021
Mina | Marbella Villas Construction Update | July 2021
- June 2021
Mina | Marbella Villas Construction Update | June 2021
- April 2021
Mina | Marbella Villas Construction Update | April 2021
- December 2020
Mina | Marbella Villas Construction Update | December 2020
- November 2020
Mina | Marbella Villas Construction Update | November 2020
- October 2020
Mina | Marbella Villas Construction Update | October 2020
- October 2020
Mina | Marbella Villas Construction Update | October 2020
- August 2020
Mina | Marbella Villas Construction Update | August 2020
- July 2020
Mina | Marbella Villas Construction Update | July 2020
- June 2020
Mina | Marbella Villas Construction Update | June 2020
Payment plan
- Phase 110%On booking
- Phase 290%During construction
Payment plan worked out
Enter a target price to see how the payment stages land against your budget.
| Stage | % | AED |
|---|---|---|
| On booking | 10% | AED 0 |
| During construction | 90% | AED 0 |
| Total | 100% | AED 0 |
Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.
Amenities




- School al jazeerah alhamra3.3 km · 6 min
- Al Jazira Al Hamra Garden5.9 km · 8 min
- The Lagoon1.6 km · 4 min
- Sharjah International Airport74.7 km · 47 min
- Al Jazeera Beach 24.5 km · 7 min
Distances and times shown are approximate, computed against generalised landmark coordinates and typical traffic conditions. Use them as a guide; actual commute time depends on building exit, district routing and time of day.
Documents
- Escrow number
- 0002562403001
- Service charge
- 6 AED/sqft
- Furnishing
- Unfurnished
- Construction start
- 2024-04-22
- Construction end
- 2022-06-30
- Buildings
- 1
- Readiness
- 100%
- Villas
2, 3, 4 & 5 bedroom villas
- 5 BR Villa3 spaces
- 4 BR Villa2 spaces
- 2 BR Villa2 spaces
- 3 BR Apartment2 spaces
Frequently asked
Who is the developer of Marbella Villas?+
RAK Properties
Where is Marbella Villas located?+
Marbella Villas is located in Mina Al Arab, Ras Al Khaimah, United Arab Emirates.
When is Marbella Villas handing over?+
Handover is scheduled for Q2 2022; the project is 100% complete.
What is the price of Marbella Villas?+
Prices at Marbella Villas start from AED 0.
Is Marbella Villas registered with escrow?+
Yes, Marbella Villas has escrow number 0002562403001 with the Dubai Land Department.
Request brochure, availability or a viewing.
A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Marbella Villas.


