- From
- AED 0
- Status
- Sold out
- Handover
- JUL 2028
- Size
- from 0 sqft
- Residences
- —
- Construction
- 7% complete
- Furnishing
- no
- Service charge
- 3-4 AED/sqft
- Buildings
- 1
Kaia is a residential community by Emaar within The Valley, a master-planned district positioned along the Dubai–Al Ain Road corridor, with completion scheduled for July 2028.
# The community and its position within The Valley
The Valley is one of Emaar's larger land-based projects, set well to the east of central Dubai. It occupies a quieter corridor than the developer's downtown or marina-adjacent schemes, and that distance is the point: the master plan is organised around open ground, low densities, and a pace of life closer to suburban than urban. Kaia sits within this framework as a townhouse-style cluster, its architecture drawing on contemporary design with a neutral palette intended to read as calm rather than conspicuous.
Construction is at roughly seven per cent completion, which places it early in its build cycle ahead of the mid-2028 handover.
# Residences, layouts and specification
Specific unit counts, sizes and floor plans are not currently published for Kaia. What the developer confirms is an unfurnished product, leaving residents to fit out and personalise against what the original design describes as a neutral material palette. That approach suits buyers who prefer to impose their own specification rather than inherit someone else's selections. Kitchens are described as equipped.
Service charges are projected at 3 to 4 AED per square foot, which is typical for a ground-level community of this type and notably lower than the per-square-foot rates common in high-rise towers.
# Amenities on site
The amenity provision at Kaia is tailored toward family use rather than resort-style spectacle. A swimming pool and expansive landscaped grounds form the social core, with an indoor multipurpose room available for more structured activities. There is a dedicated kids' play area and a pet park, the latter increasingly relevant to European and GCC buyers who relocate with animals and find many Dubai communities poorly equipped for them.
Outdoor areas are listed as a broader category, consistent with the community's emphasis on accessible green space over densely programmed facilities.
# Distance to key destinations
The Valley's location requires honest assessment. Jumeira Beach sits approximately 45.6 km away, Downtown Dubai is 38.6 km, and Cityland Mall comes in at around 33.8 km. Al Maktoum International Airport is 39.5 km, which will become more relevant as that facility expands. The Lycée Français International Elementary School is roughly 25.9 km from the community.
These distances reflect the district's character. Residents commit to a quieter, more self-contained environment and accept that central Dubai requires a deliberate commute. For buyers who work remotely, whose children attend nearby schools, or who prioritise space over proximity to the city's commercial centre, the trade-off is straightforward.
# Who Kaia suits, and where it sits in the current market
Emaar's track record in master-planned communities, from Arabian Ranches through to Emaar South, gives Kaia a credible foundation for buyers weighing developer risk on an off-plan commitment stretching to 2028. The project is currently listed as out of stock, which limits immediate entry, but the profile it represents remains in demand: low-density family living with manageable service charges, developer-grade infrastructure, and the long-term capital case that comes with a district still building out its full amenity base.
The buyer most likely to revisit Kaia when inventory releases is one prioritising outdoor space, household scale, and the long arc of a maturing community over immediate access to Dubai's centre.
Gallery
Payment plan
- Step 110%On booking
- Step 270%During construction
- Step 320%Upon Handover
Payment plan worked out
Enter a target price to see how the payment stages land against your budget.
| Stage | % | AED |
|---|---|---|
| On booking | 10% | AED 0 |
| During construction | 70% | AED 0 |
| Upon Handover | 20% | AED 0 |
| Total | 100% | AED 0 |
Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.
Amenities






- Lycee Francais International Elementary School25.9 km
- Nad Al Sheba Park31.5 km
- Cityland Mall33.8 km
- Jumeira Beach45.6 km
- Downtown Dubai38.6 km
- Al Maktoum International Airport39.5 km
Documents
- Escrow number
- 10653441920051
- Service charge
- 3-4 AED/sqft
- Furnishing
- no
- Construction start
- 2025-02-28
- Construction end
- 2028-07-31
- Buildings
- 1
- Readiness
- 7%
- Townhouses
3 & 4 bedroom townhouses
- 3 BR townhouses2 spaces
- 4 BR townhouses2 spaces
Frequently asked
Who is the developer of Kaia at The Valley?+
Emaar
Where is Kaia at The Valley located?+
Kaia at The Valley is located in The Valley, Dubai, United Arab Emirates.
When is Kaia at The Valley handing over?+
Handover is scheduled for JUL 2028; the project is 7% complete.
What is the price of Kaia at The Valley?+
Prices at Kaia at The Valley start from AED 0.
Is Kaia at The Valley registered with escrow?+
Yes, Kaia at The Valley has escrow number 10653441920051 with the Dubai Land Department.
Request brochure, availability or a viewing.
A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Kaia at The Valley.



