JRE · Joshi Real Estate
High Best Tower
Sold outTrue Future

High Best Tower

MBR District 11 (Meydan South), Dubai
From
AED 3,005,785
Handover
DEC 2025
Enquire
The Project
From
AED 3,005,785
Status
Sold out
Handover
DEC 2025
Size
1,019–1,182 sqft
Residences
Construction
70% complete
Furnishing
yes
Service charge
16-18 AED/sqft
Buildings
1

High Best Tower is a furnished residential tower by True Future, situated in MBR District 11 within the Meydan South precinct. Scheduled for completion in December 2025 and currently 70 per cent through construction, it offers apartments priced between AED 3.0 million and AED 3.5 million across a size range of roughly 1,019 to 1,182 square feet.

# The Tower and Its Position in Meydan South

MBR District 11 sits within the broader Mohammed Bin Rashid City masterplan, a large-scale mixed-use development that has drawn substantial developer activity over the past five years as infrastructure has matured. Meydan South specifically occupies the southern arc of this masterplan, positioned between the established grid of Business Bay and the quieter residential expanses pushing out towards Dubai South.

High Best Tower is a single building. Its scale is residential rather than monumental, which suits the neighbourhood's emerging character: a district of mid-scale towers filling in around green corridors and community infrastructure rather than competing for skyline dominance.

At 70 per cent construction completion with a handover date of December 2025, the project is at a stage where buyers can inspect tangible progress on site.

# Residences, Layouts and Specification

Apartments at High Best Tower span 1,019 to 1,182 square feet, a footprint that positions them as generous one-bedroom or compact two-bedroom homes by Dubai standards. All units are fully furnished, with smart home systems and equipped kitchens included in the specification. That removes a significant post-handover cost and complication for overseas buyers and investors targeting the rental market.

The furnished delivery standard, combined with a service charge running at AED 16 to 18 per square foot annually, gives buyers a reasonably legible total cost of ownership from the outset.

# Amenity Provision Across the Building

The amenity programme at High Best Tower is broader than most buildings at this price point would suggest. The roster includes an infinity pool, jacuzzi, sauna, yoga studio, fitness facilities, and meditation and reflexology pathways, which together constitute a coherent wellness offer rather than a list of unrelated features.

# Social and Family-Oriented Spaces

Beyond the wellness facilities, the building provides an outdoor cinema, BBQ area, gaming room, kids play area, imagination playroom, and an innovation hub. A social hub and meeting lounge completes the mix. For families or buyers who plan to use the property as a primary residence, this range covers daily social and recreational needs without requiring residents to leave the building.

# Location and Practical Connectivity

Kent College Dubai sits approximately 2 kilometres away, making the location workable for families with school-age children. Downtown Dubai is 13.8 kilometres from the site, Silicon Central Mall is 7.1 kilometres, and Central Park falls at 6.5 kilometres. Dubai International Airport is 25.3 kilometres, a distance that, depending on traffic, translates to a 25 to 40-minute drive.

Jumeira Public Beach, at 22.2 kilometres, is accessible but not proximate. Buyers for whom beach access is a daily priority would find other Dubai districts more convenient.

# What High Best Tower Represents for Its Target Buyer

The project occupies a specific and logical position in Dubai's market: a furnished, mid-size apartment in an emerging masterplan community, priced in the AED 3.0 to 3.5 million range, with a comprehensive amenity stack and a near-term handover.

That profile fits two clear buyer types. The first is the overseas investor seeking a rental-ready asset in a district with growing residential density and improving infrastructure. The furnished specification and December 2025 delivery support a relatively quick path to income. The second is the end-user, particularly a family or professional couple relocating from the UK, Europe, or Asia, for whom the nearby school, wellness-focused amenities, and reasonable proximity to Downtown Dubai cover most daily requirements.

Meydan South is not yet a fully formed neighbourhood. Buyers here are making a considered bet on the pace of the surrounding masterplan's completion, a calculation that Dubai's track record in this particular corridor has generally rewarded.

Structure

Payment plan

Payment Plan
  1. Step 1
    10%
    On booking
  2. Step 2
    20%
    During construction
  3. Step 3
    70%
    Upon Handover
Calculator

Payment plan worked out

Enter a target price to see how the payment stages land against your budget.

Stage%AED
On booking10%AED 300,579
During construction20%AED 601,157
Upon Handover70%AED 2,104,050
Total100%AED 3,005,785
Discuss this plan with an advisor

Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.

Lifestyle

Amenities

Kids Play Area
Gaming Room
Bbq Area
Outdoor Cinema
Meditation & Reflexology Pathways
Yoga Studio
Fitness
Imagination Playroom
Innovation Hub
Social Hub & Meeting Lounge
Sauna
Infinity Pool
Jacuzzi
Setting

Location

Set in MBR District 11 (Meydan South), Dubai. Explore more in our MBR District 11 (Meydan South) guide.

Nearby
  • Kent College Dubai2 km
  • Silicon Central Mall7.1 km
  • Central Park6.5 km
  • Jumeira Public Beach22.2 km
  • Dubai International Airport25.3 km
  • Downtown Dubai13.8 km
Resources

Documents

Escrow number
3718487279502
Service charge
16-18 AED/sqft
Furnishing
yes
Construction start
2024-11-02
Construction end
2026-11-01
0
Buildings
1
Readiness
70%
Buildings
  • 2 Buildings

    1, 2 & 3 bedroom apartments

Parking
  • 3 BR apartment2 spaces
  • 2 BR apartment1 space
  • 1 BR apartment1 space
Questions

Frequently asked

Who is the developer of High Best Tower?+

True Future

Where is High Best Tower located?+

High Best Tower is located in MBR District 11 (Meydan South), Dubai, United Arab Emirates.

When is High Best Tower handing over?+

Handover is scheduled for DEC 2025; the project is 70% complete.

What is the price of High Best Tower?+

Prices at High Best Tower currently range from AED 3,005,785 to AED 3,485,897.

Is High Best Tower registered with escrow?+

Yes, High Best Tower has escrow number 3718487279502 with the Dubai Land Department.

Enquire about High Best Tower

Request brochure, availability or a viewing.

A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for High Best Tower.

By sending this enquiry you agree to be contacted by a JRE advisor. See our privacy policy.