JRE · Joshi Real Estate
Greenway
Sold outEmaar

Greenway

Emaar South, Dubai
From
AED 0
Handover
MAY 2028
Enquire
The Project
From
AED 0
Status
Sold out
Handover
MAY 2028
Size
from 0 sqft
Residences
Construction
23% complete
Furnishing
only kitchen
Service charge
3-4 AED/sqft
Buildings
1

Greenway is a residential development by Emaar, located within the master-planned Emaar South district in Dubai's southern corridor, with completion scheduled for May 2028.

# The Building and Its Position in Emaar South

Emaar South sits in the south-western quadrant of Dubai, in the zone that grew up around the Expo 2020 site and the ongoing expansion of Al Maktoum International Airport. Greenway is a single building within this wider community, currently at 23.2 per cent construction completion. The district is broadly characterised by low-rise and mid-rise residential blocks set within landscaped green corridors, a deliberate departure from the density of older Dubai neighbourhoods.

The project is under construction and currently sold out, which places it in a category familiar to buyers of Emaar's secondary pipeline: a completed sale cycle that nonetheless has four years of delivery runway remaining.

# Residences, Kitchens and Interior Specification

Specific unit counts, floor areas and price points are not publicly disclosed for this phase. What is confirmed: residences come with fitted kitchens, and that is the extent of included furnishing. The interior palette, as described by the developer, draws on natural, earthy tones, with large windows intended to maximise both light and a sense of space.

Buyers considering a resale or assignment purchase should request the unit schedule directly, as the mix across the building has not been published in detail.

# What the Amenity Offering Looks Like on the Ground

The confirmed amenity list is modest but considered. A swimming pool and a kids' play area address the family-living baseline that most buyers in this price corridor expect. The landscaped area suggests meaningful green space integrated into the ground plane rather than confined to a rooftop.

# A Detail Worth Understanding

The skate park is the outlier. It is a relatively unusual inclusion for a mid-market residential block in Dubai, and it signals something about the intended demographic: active households with older children or teenagers, rather than the investor-centric buyer profile that dominates some Emaar South sub-projects.

Service charges are positioned at 3 to 4 AED per square foot annually, which sits within the standard range for comparable Emaar communities.

# Location Logic: Airport Proximity and the Southern Corridor

Al Maktoum International Airport is the defining geographic anchor for Emaar South. Expansion plans for the airport, if they proceed on the timelines discussed publicly, would substantially increase the economic gravity of this corridor over the next decade. For buyers thinking about a five-to-seven-year horizon rather than immediate yield, the area's trajectory is the primary argument.

Connectivity to central Dubai runs via Sheikh Mohammed Bin Zayed Road and Emirates Road. The commute to Downtown Dubai or Dubai Marina is real and should be tested during peak hours before a purchase decision is made.

# Who Greenway Suits, and What the Market Context Suggests

The sold-out status at this stage of construction confirms that Emaar's sales pace in Emaar South has remained strong, driven by competitive entry prices relative to more central districts. For buyers who missed the launch, a resale or assignment from an original purchaser is the practical route in.

Greenway is best suited to end-users or long-hold investors with conviction on the southern corridor's airport-driven growth story. It is not a short-cycle trade. The combination of a 2028 delivery date, a fitted-only specification and a family-amenity package points toward owner-occupiers, or investors targeting the rental market that will serve airport and logistics-sector professionals as the area matures.

Structure

Payment plan

Payment Plan
Calculator

Payment plan worked out

Enter a target price to see how the payment stages land against your budget.

Stage%AED
TotalAED 0
Discuss this plan with an advisor

Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.

Lifestyle

Amenities

Skate Park
Landscaped Area
Swimming Pool
Kids Play Area
Setting

Location

Set in Emaar South, Dubai. Explore more in our Emaar South guide.

Resources

Documents

Escrow number
001582400684601
Service charge
3-4 AED/sqft
Furnishing
only kitchen
Construction start
2024-10-04
Construction end
2028-05-31
0
Buildings
1
Readiness
23%
Buildings
  • Townhouses

    3 & 4 bedroom townhouses

Parking
  • 3 BR townhouses2 spaces
  • 4 BR townhouses2 spaces
Questions

Frequently asked

Who is the developer of Greenway?+

Emaar

Where is Greenway located?+

Greenway is located in Emaar South, Dubai, United Arab Emirates.

When is Greenway handing over?+

Handover is scheduled for MAY 2028; the project is 23% complete.

What is the price of Greenway?+

Prices at Greenway start from AED 0.

Is Greenway registered with escrow?+

Yes, Greenway has escrow number 001582400684601 with the Dubai Land Department.

Enquire about Greenway

Request brochure, availability or a viewing.

A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Greenway.

By sending this enquiry you agree to be contacted by a JRE advisor. See our privacy policy.