JRE · Joshi Real Estate
District One West Phase 2
Sold outNakheel

District One West Phase 2

Al Quoz 2, Dubai
From
AED 0
Handover
Q1 2028
Enquire
The Project
From
AED 0
Status
Sold out
Handover
Q1 2028
Size
from 0 sqft
Residences
Construction
22% complete
Furnishing
no
Service charge
6-7  AED/sqft
Buildings
1

District One West Phase 2 is a gated villa community developed by Nakheel within Mohammed Bin Rashid Al Maktoum City, positioned in the Al Quoz 2 precinct and scheduled for completion in Q1 2028. The project sits within the broader District One masterplan and comprises four, five and six-bedroom villas arranged around a Crystal Lagoon with direct beach access.

# The community and its place within MBR City

Mohammed Bin Rashid Al Maktoum City has evolved steadily from concept to one of Dubai's most coherent large-scale residential districts, with District One as its flagship low-rise component. Phase 2 West continues that trajectory: a gated enclave that prioritises green space and waterfront access in a city where both are genuinely scarce at this scale.

Construction is underway, with completion progress recorded at approximately 22 per cent. Handover is targeted for Q1 2028, which places it within the current development cycle attracting substantial off-plan demand from buyers seeking Dubai residency benefits alongside long-term capital positioning.

The community sits at a considered remove from the traffic density of central Dubai, yet the proximity to key arterials keeps the city accessible. The gated format is a deliberate design choice, limiting through-traffic and reinforcing the residential character of the neighbourhood.

# Villa architecture across four, five and six bedrooms

The villa range spans three bedroom configurations, each with a distinct architectural language that nonetheless shares a common vocabulary: stone and glass exteriors, flat or projecting rooflines, and a consistent emphasis on indoor-outdoor continuity.

Six-bedroom villas read as the most formally assertive of the three types. Geometric volumes, large glass facades and flat roofs are organised to draw views toward the beach while maintaining privacy between plots. Terraces extend across all three levels.

Five-bedroom villas take a cleaner, more restrained approach. The upper floor carries a shaded balcony with a glass balustrade; the ground level opens to a covered patio that extends into landscaped garden space. The material palette, white accents, stone and glass, keeps the composition controlled rather than decorative.

Four-bedroom villas play with projection: the first floor cantilevers outward, creating visual interest at the facade while the interior benefits from the light admitted by generous glazing. White plaster and natural stone textures sit alongside each other without competing.

All villas are delivered unfurnished, which allows buyers to specify interiors to their own standards. Kitchens come equipped.

# Amenities built around the lagoon

The lifestyle proposition centres on the Crystal Lagoon, a man-made swimmable water feature with sandy beaches that gives the community a resort quality not easily replicated in a conventional residential compound.

Beyond the waterfront, the amenities list includes sports courts, an outdoor gym and a children's playground. These are not elaborate, but they are appropriate to the villa-community format, where residents typically value open space and privacy over dense programmatic offerings.

Service charges are projected at 6 to 7 AED per square foot per annum, a figure worth factoring into holding cost calculations alongside mortgage or opportunity cost assumptions.

# How District One West Phase 2 sits in the current Dubai market

The project is currently out of stock, which reflects broader demand patterns in the Dubai villa segment, where quality gated product within established masterplans has absorbed buyer interest faster than supply has expanded. MBR City's planning framework and Nakheel's development track record give the project institutional credibility that newer or less-defined masterplans cannot yet match.

For an international buyer, the combination of a lagoon address, a reputable developer and a Q1 2028 delivery window positions this as a medium-term hold rather than an immediate-occupancy purchase. Buyers drawn to this profile typically include European and GCC families relocating to Dubai permanently, as well as Asian investors building a Dubai asset alongside holdings in London or Singapore. The gated format, the school-proximity logic of MBR City and the relatively contained service charge sit well against that audience's practical requirements.

Structure

Payment plan

Payment Plan
  1. Step 1
    20%
    On booking
  2. Step 2
    60%
    During Construction
  3. Step 3
    20%
    Upon Handover
Calculator

Payment plan worked out

Enter a target price to see how the payment stages land against your budget.

Stage%AED
On booking20%AED 0
During Construction 60%AED 0
Upon Handover20%AED 0
Total100%AED 0
Discuss this plan with an advisor

Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.

Lifestyle

Amenities

Sandy Beaches
Sports Courts
Children'S Playground
Outdoor Gym
Setting

Location

Set in Al Quoz 2, Dubai. Explore more in our Al Quoz 2 guide.

Resources

Documents

Escrow number
001582391095301
Service charge
6-7  AED/sqft
Furnishing
no
Construction start
2024-11-20
Construction end
2028-03-31
0
Buildings
1
Readiness
22%
Buildings
  • Villas

    4, 5 & 6 bedroom villas

Parking
  • 4 BR villas2 spaces
  • 5 BR villas3 spaces
  • 6 BR villas4 spaces
Questions

Frequently asked

Who is the developer of District One West Phase 2?+

Nakheel

Where is District One West Phase 2 located?+

District One West Phase 2 is located in Al Quoz 2, Dubai, United Arab Emirates.

When is District One West Phase 2 handing over?+

Handover is scheduled for Q1 2028; the project is 22% complete.

What is the price of District One West Phase 2?+

Prices at District One West Phase 2 start from AED 0.

Is District One West Phase 2 registered with escrow?+

Yes, District One West Phase 2 has escrow number 001582391095301 with the Dubai Land Department.

Enquire about District One West Phase 2

Request brochure, availability or a viewing.

A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for District One West Phase 2.

By sending this enquiry you agree to be contacted by a JRE advisor. See our privacy policy.