
- From
- On request
- Status
- Sold out
- Handover
- Q3 2027
- Size
- from 0 sqft
- Residences
- -
- Construction
- 28% complete
- Furnishing
- Yes
- Buildings
- 2
Bluewaters Bay is a furnished residential development by Meraas, situated at the entrance of Bluewaters Island off the Jumeirah Beach Residence coastline. Comprising two buildings scheduled for completion in Q3 2027, it is currently under construction with approximately 28 percent of the build complete.
# The Two Buildings and Their Position on Bluewaters Island
Bluewaters Island occupies a narrow strip of reclaimed land directly off JBR, connected to the mainland by a dedicated road bridge and positioned between Dubai Marina and Palm Jumeirah. The island is a known Meraas project, anchored by Ain Dubai and a retail and hospitality strip that draws both residents and visitors. Bluewaters Bay sits at the island's entrance, which gives the two buildings an orientation that captures water on multiple sides.
The architecture reads as contemporary coastal: floor-to-ceiling glazing, open volumes and generous terraces that push the interior towards the surrounding sea views. The reference point, at least visually, is the kind of low-fuss coastal modernism associated with Miami's residential districts, though the context here is the Arabian Gulf rather than Biscayne Bay.
At 28 percent construction progress, the project is moving through its early structural phase, with handover set for mid-2027.
# Residences, Specification and Furnished Finish
All residences come fully furnished, which places Bluewaters Bay in a particular tier of the Dubai market: buyers acquire a turnkey asset rather than a shell awaiting fit-out decisions. The specification runs to open-plan kitchen layouts, floor-to-ceiling glass across living areas, and expanded terraces that function as genuine outdoor rooms rather than token balconies.
Bathroom finishes are described as upgraded, and the kitchens carry a superior-grade finish relative to standard developer product in the JBR corridor.
Specific unit sizes and pricing are not currently available through JRE, as the project is listed as out of stock. Buyers interested in availability or re-sale opportunities should contact JRE directly.
# Amenities on Site
The facilities at Bluewaters Bay are residential in character rather than resort-scaled. A fitness centre and tennis court address active use. Community gardens and open pathways provide quieter outdoor space oriented towards the water. A kids' play area makes the development functional for families, and on-site restaurants and cafés reduce the need to leave the island for everyday dining.
The island itself extends those amenities considerably: the existing Bluewaters retail and dining strip is within walking distance, and Ain Dubai provides a recognisable landmark for guests.
# Getting Off the Island: Connections and Proximity
Palm Jumeirah sits approximately five kilometres away, roughly ten minutes by car. Dubai Marina Mall is just over six kilometres, a twelve-minute drive under normal conditions. Downtown Dubai is 13.5 kilometres, accessible in around fifteen minutes via Sheikh Zayed Road. Dubai International Airport sits further east at 36 kilometres, typically a thirty-minute drive.
The island's single road access point is the main variable in journey times. During peak hours, the bridge connecting Bluewaters to the JBR mainland can add time to any of the above estimates, a practical consideration for buyers who commute or travel frequently.
# Who This Project Suits, and Where It Sits in the Market
Bluewaters Bay addresses a specific buyer: someone who wants a waterfront address with genuine island character, a fully fitted and furnished product, and proximity to both the Marina corridor and Palm Jumeirah, without buying directly into either. For GCC buyers seeking a secondary residence or holiday home, the furnished delivery removes the friction of remote fit-out management. For European and Asian investors, it represents a mid-to-long hold in one of Dubai's more architecturally coherent island addresses, with a developer, Meraas, that has a consistent track record on the island itself.
The Q3 2027 delivery timeline places it in a construction window that suits buyers comfortable with a phased payment structure and a two-year wait for occupation or rental yield.
Gallery
Amenities





- Downtown Dubai13.5 km · 15 min
- Dubai International Academy13 km · 17 min
- Downtown25 km · 24 min
- Dubai International Airport36 km · 28 min
- DXB Airport27 km · 30 min
- Calistenics park6.2 km · 9 min
- Palm Jumeirah5.1 km · 10 min
- Dubai Marina Mall6.4 km · 12 min
- Marina Beach6.7 km · 9 min
Distances and times shown are approximate, computed against generalised landmark coordinates and typical traffic conditions. Use them as a guide; actual commute time depends on building exit, district routing and time of day.
Documents
- Escrow number
- 10497411920036
- Furnishing
- Yes
- Construction start
- 2023-02-25
- Construction end
- 2027-03-31
- Buildings
- 2
- Readiness
- 28%
- Tower A
1, 2, 3 & 4 bedroom apartments & 5 bedroom penthouses
- Tower B
1, 2, 3 & 4 bedroom apartments & 5 bedroom penthouses
- 2 BR Apartment1 space
- 4 BR Apartment2 spaces
- 3 BR Apartment2 spaces
- 1 BR Apartment1 space
Frequently asked
Who is the developer of Bluewaters Bay?+
Meraas
Where is Bluewaters Bay located?+
Bluewaters Bay is located in Blue Waters Island, .
When is Bluewaters Bay handing over?+
Handover is scheduled for Q3 2027; the project is 28% complete.
What is the price of Bluewaters Bay?+
Prices at Bluewaters Bay start from AED 0.
Is Bluewaters Bay registered with escrow?+
Yes, Bluewaters Bay has escrow number 10497411920036 with the Dubai Land Department.
Related residences
Request brochure, availability or a viewing.
A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Bluewaters Bay.


