Film
- From
- On request
- Status
- Sold out
- Handover
- AUG 2025
- Size
- from 0 sqft
- Residences
- -
- Construction
- under construction
- Furnishing
- Unfurnished
- Service charge
- 10 AED/sqft
- Buildings
- 2
Bayviews is a two-building residential development by RAK Properties, situated within the Mina Al Arab masterplan on the Ras Al Khaimah coastline, with a scheduled completion of August 2025.
# The complex and its position within Mina Al Arab
Mina Al Arab occupies a stretch of the Arabian Gulf waterfront in Ras Al Khaimah, the northernmost of the seven Emirates. The masterplan is notable for its environmental setting: over two million square metres of protected mangrove area surround the community, alongside a flamingo reserve and documented marine habitats. Bayviews sits within this context as a two-tower island complex, oriented to capture views across the Gulf toward the Hajar Mountains.
The architecture is designed to read as part of the coastal landscape rather than against it. Private balconies feature prominently across the building's massing, a deliberate choice given the panoramic outlook the site affords.
# Residences, specification and outdoor space
Specific floor plans and unit sizes have not been disclosed in publicly available materials at this stage, and the development is currently listed as out of stock. What is confirmed: residences are unfurnished, and kitchens are equipped as standard. The service charge is set at 10 AED per square foot.
Balconies are a consistent feature across unit types, positioned to make the most of the sea and mountain views the site commands. Given the island positioning within the masterplan, the relationship between interior space and the surrounding waterscape is central to the residential proposition.
# Amenities on site
The facility programme covers the fundamentals expected at this level of coastal residential development without excess.
# Active and leisure
A gym, jogging tracks and outdoor sports facilities serve residents with everyday fitness infrastructure. A swimming pool adds a further amenity layer, and a dedicated kids' play area accommodates families. The Seaviews private beach access is the most distinctive offering, providing direct connectivity to the Gulf waterfront without leaving the development.
Retail and food and beverage hubs are included within the broader Mina Al Arab masterplan, extending the day-to-day convenience offer beyond the immediate complex.
# The surrounding area and regional connections
The Lagoon, one of the waterfront focal points within Mina Al Arab, sits 1.4 kilometres from Bayviews. Al Jazeera Beach 2 is approximately 4.3 kilometres away, and Al Jazira Al Hamra Garden, a heritage site of some significance in the region, is around 5.7 kilometres from the development. A school is located 5.3 kilometres away, relevant for internationally mobile families considering full-time residency.
Ras Al Khaimah International Airport provides the primary air connection for residents. Sharjah International Airport is 74.5 kilometres away, adding an additional gateway, though Dubai International Airport, the region's principal hub, sits within reasonable driving distance for regular travellers.
# Who this development suits and where it sits in the market
Bayviews addresses a specific buyer profile: those seeking a coastal Ras Al Khaimah residence within an established, ecologically considered masterplan, at a service charge of 10 AED per square foot. The development draws on RAK Properties' existing position within Mina Al Arab, a project that has accumulated a track record over several years rather than arriving as a standalone speculative scheme.
For international buyers weighing up Ras Al Khaimah against Dubai, the calculation typically involves quieter surroundings, direct beach access and a lower entry cost, offset against a less liquid resale market. Bayviews, delivered at completion in August 2025, fits that calculus. The mangrove and wildlife setting distinguishes Mina Al Arab from the more densely developed coastal corridors further south, which carries genuine appeal for buyers who prioritise natural environment over urban density.
Gallery
Project videos
Supporting films, shorts and lifestyle clips from the developer's official channel. Tap any tile to open the full embed.
Build progress
Construction updates from the developer, newest first. Track structural progress on site without waiting for the next brochure cycle.
- December 2025
Mina | Bayviews Construction Progress | December 2025
- April 2025
Mina | Bayviews Construction Update | April 2025
- March 2025
Mina | Bayviews Construction Update | March 2025
- January 2025
Mina | Bayviews Construction Update | January 2025
- December 2024
Mina | Bayviews Construction Update | December 2024
- November 2024
Mina | Bayviews Construction Update | November 2024
- October 2024
Mina | Bayviews Construction Update | October 2024
- August 2024
Mina | Bayviews Construction Update | August 2024
- June 2024
Mina | Bayviews Construction Update | June 2024
- May 2024
Mina | Bayviews Construction Update | May 2024
- April 2024
Mina | Bayviews Construction Update | April 2024
- February 2024
Mina | Bayviews Construction Update | February 2024
Payment plan
- Phase 110%On Booking
- Phase 230%During construction
- Phase 360%Upon Handover
- Phase 110%On Booking
- Phase 230%During construction
- Phase 310%Upon Handover
- Phase 450%PH for 2 years
Payment plan worked out
Enter a target price to see how the payment stages land against your budget.
| Stage | % | AED |
|---|---|---|
| On Booking | 10% | AED 0 |
| During construction | 30% | AED 0 |
| Upon Handover | 60% | AED 0 |
| Total | 100% | AED 0 |
Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.
Amenities







- Al Jazira Al Hamra Garden5.7 km
- Al Jazeera Beach 24.3 km
- Sharjah International Airport74.5 km
- School al jazeerah alhamra5.3 km
- The Lagoon1.4 km
Distances and times shown are approximate, computed against generalised landmark coordinates and typical traffic conditions. Use them as a guide; actual commute time depends on building exit, district routing and time of day.
Documents
- Service charge
- 10 AED/sqft
- Furnishing
- Unfurnished
- Construction start
- 2024-04-22
- Construction end
- 2025-08-31
- Buildings
- 2
- North Tower
Studio, 1 & 2 bedroom apartments
- South Tower
Studio, 1 & 2 bedroom apartments
- 2 BR Apartment1 space
- 1 BR Apartment1 space
- Studio Apartment1 space
Frequently asked
Who is the developer of Bayviews?+
RAK Properties
Where is Bayviews located?+
Bayviews is located in Mina Al Arab, Ras Al Khaimah, United Arab Emirates.
When is Bayviews handing over?+
Handover is scheduled for AUG 2025.
What is the price of Bayviews?+
Prices at Bayviews start from AED 0.
Is Bayviews registered with escrow?+
JRE will confirm escrow registration on request.
Request brochure, availability or a viewing.
A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Bayviews.







