- From
- AED 0
- Status
- Sold out
- Handover
- MAR 2028
- Size
- from 0 sqft
- Residences
- —
- Construction
- 7% complete
- Furnishing
- no
- Service charge
- 3.5 AED/sqft
- Buildings
- 1
Sun City is a townhouse development by DAMAC Properties, situated within the Damac Suncity masterplan in Dubailand, and scheduled for handover in March 2028.
# The masterplan and its position in Dubailand
Dubailand is one of Dubai's larger residential and leisure corridors, stretching across the city's southern reaches along Emirates Road. Sun City sits within DAMAC's own branded enclave inside that corridor, a masterplan configuration the developer has used elsewhere to consolidate amenity provision and maintain a consistent architectural language across the community.
Construction is currently at 7.08 per cent completion, which places the project early in its delivery cycle with roughly three years remaining. The development comprises a single building classification, townhouses, rather than the vertical towers that define much of DAMAC's portfolio elsewhere in the city.
# Residences, layouts and finish
The developer's published information references four and five-bedroom townhouse configurations, with open-plan interiors designed to accommodate both daily family life and larger-scale entertaining. Kitchens are equipped as standard.
Specific sizing data and pricing have not been disclosed publicly at the time of writing. The residences are unfurnished. Owners should factor a service charge of 3.50 AED per square foot into their holding cost projections.
# The amenity programme
The amenity list at Sun City leans deliberately towards wellness and outdoor activity rather than the conventional gym-and-pool formula found across much of Dubai's mid-to-upper residential market.
# Wellness and outdoor programming
Facilities include outdoor sauna cabins, ice bath therapy, crystal healing, reflexology under the Go Barefoot concept, and a yoga park. There is also a forest hiking trail, jungle camping provision, and a barefoot reflexology path, which collectively suggest a positioning around nature-connected recovery rather than conventional fitness.
The Sunrise Gym handles traditional training, while the Monkey Bar Arena caters to functional and bodyweight training. An amphitheatre and a library co-working space address both cultural programming and remote working needs, two requirements that have grown considerably more relevant to buyers since 2020.
The Grand Water Fountain and the Organic World retail or produce concept round out the communal offer.
# Distance from key nodes
Sun City is 4.8 kilometres from Ranches Primary School, making it feasible for families with school-age children already enrolled or considering enrolment there. Central Park Mudon sits 8.6 kilometres away, offering an additional green leisure option outside the development itself.
Cityland Mall, at 14.3 kilometres, is the nearest significant retail destination. The distances to Downtown Dubai (32.6 km) and Al Maktoum International Airport (34.5 km) confirm the project's position in the outer suburban belt. Sufouh Beach is 21.6 kilometres, a comfortable enough drive on a clear day though not a walkable amenity.
Buyers reliant on daily access to the central business districts should model commute times honestly against Emirates Road and Hessa Street conditions.
# Who this project suits and where it sits in the market
Sun City appeals most directly to family buyers who prioritise space, a nature-inflected lifestyle, and the relative quiet of Dubai's southern suburbs over proximity to the coast or the commercial core. The wellness amenity programme is more considered than most comparably priced community projects, and the DAMAC escrow structure (account 0205892602902) provides the statutory financial protection standard to Dubai off-plan transactions.
The project is currently listed as out of stock, which means buyers are likely engaging through resale or re-release channels rather than direct developer purchase. With construction at just over seven per cent, those entering now are committing to a long hold before occupancy, a factor that suits investors comfortable with a 2025-to-2028 horizon rather than buyers seeking near-term delivery.
Gallery
Payment plan
- Step 120%On booking
- Step 255%During construction
- Step 325%Upon Handover
Payment plan worked out
Enter a target price to see how the payment stages land against your budget.
| Stage | % | AED |
|---|---|---|
| On booking | 20% | AED 0 |
| During construction | 55% | AED 0 |
| Upon Handover | 25% | AED 0 |
| Total | 100% | AED 0 |
Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.
Amenities













- Ranches Primary School4.8 km
- Central Park Mudon8.6 km
- Cityland Mall14.3 km
- Sufouh Beach21.6 km
- Al Maktoum International Airport34.5 km
- Downtown Dubai32.6 km
Documents
- Escrow number
- 0205892602902
- Service charge
- 3.5 AED/sqft
- Furnishing
- no
- Construction start
- 2024-12-02
- Construction end
- 2028-03-31
- Buildings
- 1
- Readiness
- 7%
- Townhouses
4 & 5 bedroom townhouses
- 4 BR townhouses2 spaces
- 5 BR townhouses2 spaces
Frequently asked
Who is the developer of Sun City?+
DAMAC
Where is Sun City located?+
Sun City is located in Damac Suncity, Dubai, United Arab Emirates.
When is Sun City handing over?+
Handover is scheduled for MAR 2028; the project is 7% complete.
What is the price of Sun City?+
Prices at Sun City start from AED 0.
Is Sun City registered with escrow?+
Yes, Sun City has escrow number 0205892602902 with the Dubai Land Department.
Related residences
Request brochure, availability or a viewing.
A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Sun City.



