- From
- AED 0
- Status
- Sold out
- Handover
- JUN 2025
- Size
- from 0 sqft
- Residences
- —
- Construction
- under construction
- Furnishing
- only kitchen
- Service charge
- After first 5 years: 3-4 AED/sqft
- Buildings
- 1
Sharjah Sustainable City is a master-planned villa community in Sharjah, developed by Shurooq, with its fourth and final phase due for handover in June 2025.
# A Low-Rise Community Built Around an Environmental Brief
The project occupies a dedicated plot within Sharjah, designed from the ground up around principles of energy efficiency and reduced environmental impact. Unlike the dense residential towers that define much of the Northern Emirates' recent growth, this is a horizontal community: villas arranged along pedestrian-friendly pathways, with a central green spine running through the layout. The scale is domestic rather than monumental.
Three phases are already complete and occupied, which matters to buyers assessing risk. Phase 4 is the live construction tranche, and its mid-2025 target means the broader community is already functioning around it. That pre-existing occupation gives the site a character that blank-canvas launches cannot offer.
# Villas Configured for Three, Four and Five Bedrooms
Residences come in 3, 4, and 5-bedroom configurations across multiple floor plans. Each villa is delivered with a fitted kitchen and a smart home system, but otherwise unfurnished, which suits buyers intending to specify their own interiors. The specification is oriented towards energy performance rather than decorative extravagance, a distinction that reads clearly in the architectural language.
Precise floor areas are not publicly disclosed for Phase 4 at this stage.
# Amenities Oriented Towards Daily Life, Not Resort Theatre
The community's amenity list reflects its positioning as a permanent residential address rather than a second-home enclave. A fitness centre, jogging and cycling track, and kids' play area form the active infrastructure. There is a sustainable school within the community, removing the school-run from daily life for families with younger children, alongside health clinics that reduce dependence on external facilities for routine care.
# The Farm and the Green Spine
Two elements sit slightly outside the standard amenity catalogue. The Farm is a working agricultural element embedded into the community, consistent with the sustainability brief. The green spine runs through the site as both a visual axis and a functional walkway, linking buildings to shared spaces without the interruption of vehicle traffic.
A mosque is also present on site.
# Distances from Sharjah into the Wider Emirate Network
Emirates National School sits 2.9 kilometres away, useful for families whose children are not enrolled in the on-site sustainable school. CityLife Al Tallah, a retail destination, is 7.6 kilometres out. Ajman Beach is reachable at 18.2 kilometres, providing coastal access without requiring a Dubai commute.
Dubai International Airport is 27.6 kilometres from the community. That distance is manageable by road under normal conditions, though Sharjah's traffic patterns during peak hours on the E311 and E611 corridors are a practical consideration for frequent travellers.
# Who This Community Is Built For, and What the Market Reflects
Sharjah Sustainable City occupies a niche that Dubai's villa market rarely addresses directly: owner-occupier families who place environmental credentials alongside liveability, at a price point that Sharjah's land costs have historically kept more accessible than comparable Dubai addresses.
The service charge, set at 3 to 4 AED per square foot after an initial five-year waiver, is a concrete operating cost figure that buyers can model. The waiver period provides short-term relief; the post-waiver rate is reasonable against Dubai benchmarks for managed villa communities.
For international buyers, Sharjah freehold ownership terms and proximity to Dubai's infrastructure make this a credible primary residence option rather than a speculative acquisition. The completed phases provide visible evidence of delivery. That is a more persuasive argument than a render.
Gallery
Payment plan
- Step 110%On booking
- Step 210%During construction
- Step 380%Upon Handover
Payment plan worked out
Enter a target price to see how the payment stages land against your budget.
| Stage | % | AED |
|---|---|---|
| On booking | 10% | AED 0 |
| During construction | 10% | AED 0 |
| Upon Handover | 80% | AED 0 |
| Total | 100% | AED 0 |
Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.
Amenities








- Emirates National School2.9 km
- CityLife Al Tallah7.6 km
- Ajman Beach18.2 km
- Dubai International Airport27.6 km
- Shaghrafa Ladies Park2.9 km
Documents
- Service charge
- After first 5 years: 3-4 AED/sqft
- Furnishing
- only kitchen
- Construction start
- 2024-04-22
- Construction end
- 2025-06-30
- Buildings
- 1
- Villas
3, 4 & 5 bedroom villas
- 3 BR villas2 spaces
- 4 BR villas3 spaces
- 5 BR villas3 spaces
Frequently asked
Who is the developer of Sharjah Sustainable City?+
Shurooq
Where is Sharjah Sustainable City located?+
Sharjah Sustainable City is located in Sharjah, Dubai, United Arab Emirates.
When is Sharjah Sustainable City handing over?+
Handover is scheduled for JUN 2025.
What is the price of Sharjah Sustainable City?+
Prices at Sharjah Sustainable City start from AED 0.
Is Sharjah Sustainable City registered with escrow?+
JRE will confirm escrow registration on request.
Request brochure, availability or a viewing.
A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Sharjah Sustainable City.
