Short
- From
- On request
- Status
- Sold out
- Handover
- Q3 2025
- Size
- from 0 sqft
- Residences
- 2
- Construction
- 70% complete
- Furnishing
- Yes
- Service charge
- 15 AED/sqft
- Buildings
- 1
1WOOD is a furnished residential tower by Object 1, situated in Jumeirah Village Circle and scheduled to reach completion in Q3 2025. At 18 storeys, it houses a small number of large two-bedroom apartments finished with wood-led interiors and supplied with European appliances, targeting buyers and investors who want a rent-ready asset in one of Dubai's most active mid-market districts.
# The tower and its position in Jumeirah Village Circle
Jumeirah Village Circle sits at the intersection of Al Khail Road and Sheikh Mohammed Bin Zayed Road, a location that places it within reach of both the marina corridor and the city's central business spine. Object 1 has built a single 18-storey building here, modest in scale by Dubai standards but deliberate in its design language. Wood textures and natural accents carry through both the exterior and interior, which gives the building a quieter visual register than the glass-and-chrome towers that dominate the surrounding neighbourhood.
Construction is now 70 per cent complete, with the project registered under escrow account 19210878. Delivery is expected in the third quarter of 2025.
# Two-bedroom residences with European specification
The building contains just two available residence configurations, both two-bedroom apartments. One measures 2,334 sq ft and is priced at AED 3,498,741; the other runs to 2,287 sq ft at AED 3,499,783. The near-identical pricing across meaningfully different floor plates suggests the larger unit carries a slightly more favourable per-square-foot rate, worth factoring into any comparison.
Both apartments are fully furnished and equipped with European-sourced furniture and appliances. The developer's stated intent is for units to be move-in and rent-ready from handover. Service charges are fixed at AED 15 per sq ft annually, which buyers should model into their net yield calculations before committing.
# Shared amenities within the building
The amenity list is compact but practical. A swimming pool serves both adults and children, and a gym occupies dedicated space within the building. A coworking area addresses the growing proportion of remote-working residents in JVC, while a mini-market and a kids' room round out the day-to-day offering. None of these are exceptional by Dubai standards, but together they reduce the need for residents to travel for routine needs.
# Distances and daily logistics
District 13-2 Community Park is 1.3 km from the building, giving residents a walkable green space. Sufouh Beach sits roughly 12 km away, Downtown Dubai around 21.5 km, and Dubai International Airport 31.8 km. These are road distances, and actual journey times will depend on traffic. JVC's dual-road access generally makes it more navigable than communities served by a single arterial route.
# What 1WOOD represents for the JVC investor
JVC has absorbed a significant share of Dubai's buy-to-let demand over the past several years, largely because entry prices remain below those in marina-adjacent districts while rental yields have held at competitive levels. A fully furnished two-bedroom above 2,200 sq ft at around AED 3.5 million positions 1WOOD at the larger, better-specified end of what JVC typically offers. For buyers sourcing an asset that arrives ready to lease, without the cost and delay of furnishing, the proposition is straightforward. The limited unit count also means less internal competition at the point of leasing, which matters more than most developers acknowledge.
Gallery
Project videos
Supporting films, shorts and lifestyle clips from the developer's official channel. Tap any tile to open the full embed.
Build progress
Construction updates from the developer, newest first. Track structural progress on site without waiting for the next brochure cycle.
- June 2026
1WOOD Construction Update #constructionupdate #dubairealestate #shorts #shortvideo
- June 2026
1WOOD Construction Update #object1 #dubairealestate #constructionupdate #dubailiving #shorts
- June 2026
Construction update | 1WOOD
- June 2026
Construction update | 1WOOD #shorts #realestate #object1 #constructionupdate
- June 2026
Ideal location: near attractions, offering peace and convenience | 1WOOD Construction Update
- June 2026
Ideal location: near attractions, offering peace and convenience | 1WOOD Construction Update
- June 2026
Ideal location: near attractions, offering peace and convenience | 1WOOD Construction Update
- June 2026
Ideal location: near attractions, offering peace and convenience | 1WOOD Construction Update
- June 2026
Ideal location: near attractions, offering peace and convenience | 1WOOD Construction Update
- June 2026
Ideally situated: near attractions, offering tranquility and convenience | 1WOOD Construction Update
- June 2026
Ideally situated: near attractions, offering tranquility and convenience | 1WOOD Construction Update
- June 2026
New Construction Update | 1WOOD #shorts #object1 #realestate #construction #constructionupdate
- June 2026
Perfectly located: close to attractions, yet peaceful and convenient | Construction update 1WOOD
- April 2026
1WOOD RESIDENCE, Jumeirah Village Circle Construction update (March - April 2026)
- December 2025
1WOOD Residence, Jumeirah Vilalge Circle. Construction update (November - December 2025)
Residences
2 unit configurations available at 1WOOD.
- Size
- 2,334
- Price
- AED 3,498,741
- Size
- 2,287
- Price
- AED 3,499,783
Payment plan
- Phase 110%On booking
- Phase 260%During construction
- Phase 330%Upon Handover
Payment plan worked out
Enter a target price to see how the payment stages land against your budget.
| Stage | % | AED |
|---|---|---|
| On booking | 10% | AED 0 |
| During construction | 60% | AED 0 |
| Upon Handover | 30% | AED 0 |
| Total | 100% | AED 0 |
Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.
Amenities





Location
Set in JVC (Jumeirah Village Circle), Dubai. Explore more in our JVC (Jumeirah Village Circle) guide.
- Sailkoti Shahzada shadu wela0.5 km
- District 13-2 Community Park1.3 km
- Tdawi UAE1.3 km
- Sufouh Beach12.4 km
- Downtown21.5 km
- Dubai International Airport31.8 km
Distances and times shown are approximate, computed against generalised landmark coordinates and typical traffic conditions. Use them as a guide; actual commute time depends on building exit, district routing and time of day.
Documents
- Escrow number
- 19210878
- Service charge
- 15 AED/sqft
- Furnishing
- Yes
- Construction start
- 2023-12-19
- Construction end
- 2025-09-30
- Residences
- 2
- Buildings
- 1
- Readiness
- 70%
- Building
Studio, 1 & 2 bedroom apartments
- 2 BR Apartment1 space
- 1 BR Apartment1 space
- Studio Apartment1 space
Frequently asked
Who is the developer of 1WOOD?+
Object 1
Where is 1WOOD located?+
1WOOD is located in JVC (Jumeirah Village Circle), Dubai, United Arab Emirates.
When is 1WOOD handing over?+
Handover is scheduled for Q3 2025; the project is 70% complete.
What is the price of 1WOOD?+
Prices at 1WOOD start from AED 0.
Is 1WOOD registered with escrow?+
Yes, 1WOOD has escrow number 19210878 with the Dubai Land Department.
Request brochure, availability or a viewing.
A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for 1WOOD.




