JRE · Joshi Real Estate
V Tower exterior view - Dubailand Residence Complex, Dubai - by Tiger Group
Sold outTiger Group

V Tower

Dubailand Residence Complex, Dubai
From
POA
Handover
Q4 2023
Enquire
The Project
From
On request
Status
Sold out
Handover
Q4 2023
Size
from 0 sqft
Residences
-
Construction
100% complete
Furnishing
Yes
Service charge
10 AED/sqft
Buildings
1

V Tower is a completed residential building by Tiger Group, situated in Dubailand Residence Complex along the Dubai-Al Ain Road corridor in Wadi Al Safa 5. Handed over in Q4 2023, the project delivers fully furnished apartments across a single tower and carries a service charge of 10 AED per square foot.

# The tower and its position in Dubailand Residence Complex

Dubailand Residence Complex occupies a stretch of the city that sits beyond the older, denser districts yet remains well tethered to central Dubai by the Al Ain Road. The area has developed steadily as a mid-density residential zone, attracting owner-occupiers and buy-to-let investors who want usable space at a price point that the closer-in neighbourhoods no longer offer.

V Tower is a single building. Its completion at the end of 2023 means buyers are not absorbing construction risk; the asset exists, the common areas are operational, and the building's management structure is already in place under its registered escrow account.

Tiger Group, the developer, has an established presence across several residential sub-markets in Dubai, with projects at various price points and densities.

# Residences, layouts and finish

The developer's own figures record a mix of studios, one-, two-, and three-bedroom apartments, as well as three-bedroom duplex units, spread across the building. All residences are delivered fully furnished, with kitchens equipped on handover.

That combination matters for investors particularly. A furnished, move-in-ready apartment in a completed building removes the lag between purchase and first rental income, which is a meaningful practical consideration for overseas buyers managing assets from London, Riyadh or Singapore.

Specific floor areas were not disclosed at the time of publication.

# Amenities and building services

The facilities at V Tower are functional rather than resort-style, which suits the price point and the tenant profile this location attracts.

# What the building offers

A gym and swimming pool cover the core fitness and leisure expectations. A dedicated children's play area reflects the family composition typical of the surrounding neighbourhood. Round-the-clock security camera coverage and 24-hour maintenance are managed in-house, reducing the friction that can accompany older or less professionally managed stock.

These are not elaborate amenity decks, but they are consistently in demand among the working professionals and young families who occupy Dubailand Residence Complex.

# Location, road access and daily convenience

The Dubai-Al Ain Road is the building's most significant locational asset. It connects residents westward toward central Dubai and eastward toward Abu Dhabi, making commute times manageable without dependence on a single route.

The Dubai Land community hub park is three minutes by car. LuLu Hypermarket is six minutes away, at 4.1 kilometres. Dubai Outlet Mall sits roughly nine minutes from the building. Zayed University is a 12-minute drive, which speaks to a tenant pool that includes academic staff and students.

Dubai Mall and Dubai International Airport each fall within a 25-minute drive, placing V Tower at the outer edge of what most buyers consider the central catchment, rather than outside it entirely.

# Who this building suits in the current Dubai market

V Tower addresses a specific buyer: someone looking at Dubai's residential market with a yield-first frame of reference rather than a trophy-asset one. Dubailand Residence Complex does not carry the address premium of Downtown or Dubai Marina, and it does not try to. What it offers is a completed, furnished building with a defined service charge and road connectivity that keeps it relevant to a wide tenant pool.

For a GCC-based investor seeking a second property, or a European buyer making an initial entry into Dubai real estate at a lower capital threshold, a handed-over building with no remaining construction exposure has a straightforward appeal. The furnished finish further reduces the time and cost between exchange and income.

Resale and rental enquiries should be directed through a registered brokerage, as the project is currently recorded as out of stock at the developer level.

Structure

Payment plan

Payment Plan
  1. Phase 1
    100%
    Down Payment
Calculator

Payment plan worked out

Enter a target price to see how the payment stages land against your budget.

Stage%AED
Down Payment100%AED 0
Total100%AED 0
Discuss this plan with an advisor

Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.

Lifestyle

Amenities

Gym
Swimming Pool
Play Area For Kids
24- Hour Security Camera
24 – Hour Maintenance
Setting

Location

Set in Dubailand Residence Complex, Dubai. Explore more in our Dubailand Residence Complex guide.

Nearby
  • LuLu Hypermarket4.1 km · 6 min
  • Jumeria beach24 km · 25 min
  • Zayed University10 km · 12 min
  • Nad Al Sheba 4 Park9.7 km · 11 min
  • DXB Airport24.4 km · 25 min
  • Dubai Land community hub Park1.5 km · 3 min
  • Dubai Outlet Mall5.2 km · 9 min
  • Dubai Mall20.6 km · 20 min
  • IMG Worlds of Adventure12.9 km · 15 min

Distances and times shown are approximate, computed against generalised landmark coordinates and typical traffic conditions. Use them as a guide; actual commute time depends on building exit, district routing and time of day.

Resources

Documents

Escrow number
10487681920009
Service charge
10 AED/sqft
Furnishing
Yes
Construction start
2020-01-15
Construction end
2023-12-31
0
Buildings
1
Readiness
100%
Buildings
  • Tower

    A mix of studio, 1, 2 and 3 bedroom apartments

Parking
  • 3 BR Apartment1 space
  • 1 BR Apartment1 space
  • 2 BR Apartment1 space
  • Studio Apartment1 space
Questions

Frequently asked

Who is the developer of V Tower?+

Tiger Group

Where is V Tower located?+

V Tower is located in Dubailand Residence Complex, Dubai, United Arab Emirates.

When is V Tower handing over?+

Handover is scheduled for Q4 2023; the project is 100% complete.

What is the price of V Tower?+

Prices at V Tower start from AED 0.

Is V Tower registered with escrow?+

Yes, V Tower has escrow number 10487681920009 with the Dubai Land Department.

Enquire about V Tower

Request brochure, availability or a viewing.

A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for V Tower.

By sending this enquiry you agree to be contacted by a JRE advisor. See our privacy policy.