
- From
- On request
- Status
- Sold out
- Handover
- APR 2026
- Size
- from 0 sqft
- Residences
- -
- Construction
- 87% complete
- Furnishing
- Unfurnished
- Buildings
- 1
Erin Central Park is a residential tower by Meraas, positioned within the City Walk district of Dubai and scheduled for handover in April 2026. At 87 per cent complete as of the latest construction reporting, the project sits close to the finish line with an escrow account registered under number 1006447542.
# The tower and its place in City Walk
City Walk has spent the past decade consolidating its identity as one of Dubai's more considered urban neighbourhoods: low-rise retail frontages, landscaped streetscapes, and a density that feels deliberate rather than accidental. Erin Central Park belongs to that fabric.
The development consists of a single building, its design philosophy drawn from the idea of a park-facing residence rather than a tower that happens to overlook greenery. That distinction matters in how the building reads at street level, where the relationship between built form and open space is the governing logic. Meraas, the developer behind projects including Bluewaters Island and the original City Walk master plan, brings a track record of integrated mixed-use environments to this address.
# Residences, layouts and specification
The project delivers a range of apartments spanning one to four bedrooms, alongside penthouses. Units are delivered unfurnished, with kitchens fitted, which gives buyers a clean slate for interior decisions without requiring a full fit-out from scratch.
Specific floor areas and per-square-foot pricing are not currently published, and the development is recorded as sold out. For buyers tracking the secondary market or monitoring resale inventory, the unit mix across those bedroom categories positions the building for both owner-occupiers and investors seeking a recognisable address within a mature master plan.
# Amenities and the active-living programme
The amenity stack at Erin Central Park is notable for its breadth across outdoor and recreational use.
# Sport and movement infrastructure
A half-court basketball court, tennis and squash courts, an outdoor gym and fitness station, and a dedicated running track form the active core. The skateable landscape is a less common addition in this segment and points toward a younger-demographic design brief.
Pools and water play areas, a kids' play area, and games tables extend the offering for families. Dining outlets and retail stores within or adjacent to the development reduce the need to leave the immediate precinct for daily requirements.
# Distances and daily connectivity
The City Walk retail and dining precinct sits approximately one kilometre away, a five-minute drive. Galleria Mall is reachable in seven minutes at 1.8 kilometres. Downtown Dubai, home to the DIFC financial cluster and the Dubai Mall, is 3.6 kilometres out, roughly ten minutes by car.
JSS Private School is 2.7 kilometres away, an eight-minute drive, which is a practical consideration for families relocating from the UK, India, or the GCC. Jumeirah Open Beach is accessible in ten minutes at 3.3 kilometres, a proximity that carries weight for buyers prioritising coastline access without committing to a beachfront address.
# Who this building suits, and where it sits in the market
City Walk appeals to a specific buyer: one who wants urban infrastructure and walkability without the verticality of Downtown or the financial-district adjacency of DIFC. Erin Central Park sits at the residential core of that proposition.
For international buyers from the UK or Europe, the neighbourhood's low-rise scale and park-centric layout maps onto urban typologies they already understand. For GCC and Asian buyers, the Meraas name carries institutional credibility. The sold-out primary status signals completed absorption, which for secondary-market buyers can read as a measure of genuine demand rather than speculative listings. With handover in April 2026 and construction at 87 per cent, the remaining wait is short.
Gallery
Payment plan
Payment plan worked out
Enter a target price to see how the payment stages land against your budget.
| Stage | % | AED |
|---|---|---|
| Total | - | AED 0 |
Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.
Amenities









- Galleria Mall1.8 km · 7 min
- City Walk1 km · 5 min
- Downtown3.6 km · 10 min
- JSS Private School2.7 km · 8 min
- Jumeirah Open Beach3.3 km · 10 min
Distances and times shown are approximate, computed against generalised landmark coordinates and typical traffic conditions. Use them as a guide; actual commute time depends on building exit, district routing and time of day.
Documents
- Escrow number
- 1006447542
- Furnishing
- Unfurnished
- Construction start
- 2023-04-10
- Construction end
- 2026-04-30
- Buildings
- 1
- Readiness
- 87%
- Building
1 to 4 bed apartments & 5 bed penthouses
- 4 BR Apartment2 spaces
- 2 BR Apartment1 space
- 3 BR Apartment2 spaces
- 1 BR Apartment1 space
Frequently asked
Who is the developer of Erin Central Park?+
Meraas
Where is Erin Central Park located?+
Erin Central Park is located in City Walk, Dubai, United Arab Emirates.
When is Erin Central Park handing over?+
Handover is scheduled for APR 2026; the project is 87% complete.
What is the price of Erin Central Park?+
Prices at Erin Central Park start from AED 0.
Is Erin Central Park registered with escrow?+
Yes, Erin Central Park has escrow number 1006447542 with the Dubai Land Department.
Related residences
Request brochure, availability or a viewing.
A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Erin Central Park.


