JRE · Joshi Real Estate
RIVANA exterior view - The Valley, Dubai - by Emaar
Sold outEmaar

RIVANA

The Valley, Dubai
From
POA
Handover
MAR 2027
Enquire
The Project
From
On request
Status
Sold out
Handover
MAR 2027
Size
from 0 sqft
Residences
-
Construction
77% complete
Furnishing
Unfurnished
Service charge
3-4 AED/sqft
Buildings
1

Rivana is a gated residential community by Emaar, located within The Valley on the eastern fringe of Dubai's Dubailand corridor, with completion scheduled for March 2027.

# The community and its position in Dubailand

The Valley is a master-planned town built around the premise that suburban density and open landscape are not mutually exclusive. Emaar has developed the district as a largely self-contained environment, with its own retail, schooling, healthcare, and recreational infrastructure rather than relying entirely on the wider city's provision. Rivana sits within this broader community as a gated neighbourhood, occupying a quieter residential pocket inside an already low-density setting.

Construction is progressing at 77.38 per cent completion as of the latest reported figures, placing the project well into its delivery phase ahead of the March 2027 handover date. For buyers tracking build risk, that trajectory is a meaningful data point. The community is not a tower or a high-rise cluster. It reads as a low-rise suburban environment, closer in character to a European new-build town than to the vertical residential formats that dominate central Dubai.

# Residences, specification and outdoor living

Specific unit sizes and layouts are not currently disclosed, and pricing is not listed, reflecting the project's sold-out status at the time of publication. The developer describes a contemporary residential finish with kitchens supplied with appliances. Units are unfurnished, which suits buyers who prefer to design interiors to their own specification or who are purchasing for personal occupation rather than immediate rental yield.

The gated structure of the neighbourhood means residents have defined boundaries and controlled access, a consideration for families with children and for buyers who value residential privacy within a larger mixed-use community.

# Amenities centred on outdoor activity

The amenity provision at Rivana leans heavily towards outdoor and leisure use rather than the concierge-hotel format found in many city-centre towers.

# What is included

Golden Beach, a landscaped recreation area, anchors the leisure offering. Beyond this, the community includes playgrounds, sports facilities, barbecue and picnic areas, pocket parks distributed across the neighbourhood, and retail and dining outlets for daily convenience. The emphasis is consistent: Rivana is positioned for residents who use outdoor space regularly, not those who treat amenities as a brochure item.

Service charges are set at 3 to 4 AED per square foot, which is reasonable for a low-rise gated community of this type in Dubai.

# Road connections and distances from key nodes

The Valley's location in Dubailand places it at a genuine remove from central Dubai. Downtown Dubai sits approximately 35 kilometres away, and Dubai International Airport is roughly 38.8 kilometres. La Mer beach is around 39.9 kilometres distant. Silicon Central Mall, the nearest major retail destination in the data, is approximately 18.6 kilometres out.

These are suburban distances and buyers should enter the decision with that clearly in mind. The trade-off is space, lower density, and a quieter living environment. Vernus International School Dubai is approximately 22.6 kilometres away, which is a relevant consideration for families evaluating schooling logistics.

# Who this project suits, and where it sits in the Dubai market

Rivana is a coherent choice for a specific buyer profile: families relocating from mid-density European suburbs who want a comparable standard of outdoor space and community amenity, and who have no need for daily proximity to Downtown or the Marina. It also suits investors who took positions early in the Dubai suburban belt and are holding for long-term capital appreciation as the Dubailand corridor matures.

The sold-out status signals that demand for this format has been substantive. With delivery under a year and a half away and construction past the three-quarter mark, the residual conversation for most buyers at this stage is the secondary market rather than off-plan entry.

Structure

Payment plan

Payment plan
  1. Phase 1
    10%
    On booking
  2. Phase 2
    80%
    During construction
  3. Phase 3
    10%
    Upon Handover
Calculator

Payment plan worked out

Enter a target price to see how the payment stages land against your budget.

Stage%AED
On booking10%AED 0
During construction80%AED 0
Upon Handover10%AED 0
Total100%AED 0
Discuss this plan with an advisor

Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.

Lifestyle

Amenities

Golden Beach
Playgrounds & Sports Facilities
Barbecue & Picnic Areas
Retail & Dining
Pocket Parks
Setting

Location

Set in The Valley, Dubai. Explore more in our The Valley guide.

Nearby
  • Silicon Central Mall18.6 km
  • La mer beach39.9 km
  • Dubai International Airport38.8 km
  • Downtown Dubai35 km
  • Vernus International School Dubai22.6 km

Distances and times shown are approximate, computed against generalised landmark coordinates and typical traffic conditions. Use them as a guide; actual commute time depends on building exit, district routing and time of day.

Resources

Documents

Escrow number
4031221997653020
Service charge
3-4 AED/sqft
Furnishing
Unfurnished
Construction start
2023-09-09
Construction end
2027-03-31
0
Buildings
1
Readiness
77%
Buildings
  • Twin villas

    3, 4, 5 bedroom twin villas available in two architectural styles: Clara and Kai

Parking
  • 3 BR Villa3 spaces
  • 5 BR Villa3 spaces
  • 4 BR Apartment3 spaces
Questions

Frequently asked

Who is the developer of RIVANA?+

Emaar

Where is RIVANA located?+

RIVANA is located in The Valley, Dubai, United Arab Emirates.

When is RIVANA handing over?+

Handover is scheduled for MAR 2027; the project is 77% complete.

What is the price of RIVANA?+

Prices at RIVANA start from AED 0.

Is RIVANA registered with escrow?+

Yes, RIVANA has escrow number 4031221997653020 with the Dubai Land Department.

Enquire about RIVANA

Request brochure, availability or a viewing.

A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for RIVANA.

By sending this enquiry you agree to be contacted by a JRE advisor. See our privacy policy.