JRE · Joshi Real Estate
Grove Creek Beach exterior view - Dubai Creek Harbour, Dubai - by Emaar
Sold outEmaar

Grove Creek Beach

Dubai Creek Harbour, Dubai
From
POA
Handover
JUN 2025
Enquire
The Project
From
On request
Status
Sold out
Handover
JUN 2025
Size
from 0 sqft
Residences
-
Construction
100% complete
Furnishing
Unfurnished
Service charge
22-23 AED/sqft
Buildings
1

Grove Creek Beach is a completed residential building by Emaar, positioned along the beachfront edge of Dubai Creek Harbour and handed over in June 2025.

# The building and its place in Creek Beach

Dubai Creek Harbour is Emaar's most ambitious district project: an eight-square-kilometre waterfront city built along the historic Dubai Creek, roughly 11 kilometres from the airport and 13 kilometres from Downtown. Grove Creek Beach sits within Creek Beach, a purpose-built urban beach precinct that forms the residential and leisure heart of the wider masterplan.

The project comprises a single building, now fully completed, arranged around a shared inner plaza that connects residents to the beachfront promenade. The architecture follows the contemporary low-rise language Emaar has applied across Creek Beach: horizontal massing, open-air circulation, and a pedestrian-first ground plane that distinguishes the precinct from Dubai's more typical tower-dense neighbourhoods.

The beach itself stretches for 300 metres of managed white-sand shoreline. It is, by the district's own design logic, a city beach rather than a resort one, flanked by residential buildings and intended for daily use rather than weekend escapes.

# Residences, layouts and specification

Specific unit dimensions and floor plans are not publicly listed for Grove Creek Beach, which has sold out entirely. What the building offers is a set of apartments finished to Emaar's standard Creek Beach specification: contemporary interiors using neutral material palettes, full-height glazing oriented towards either the creek, the plaza, or the beach, and unfurnished layouts that give buyers a blank canvas for their own fit-out.

Service charges run at 22 to 23 AED per square foot annually, consistent with mid-to-upper Emaar product across the harbour district.

# Amenities and communal facilities

The building's amenity package is focused on outdoor living. Direct beach access is the headline draw, supported by a community pool, a dedicated children's pool, and rooftop terraces with views across the creek and towards the Dubai Creek Tower site.

Inside, there is a fully equipped gym. Outdoor play areas and the inner plaza complete the picture. The roster is deliberately residential rather than hotel-adjacent: no spa, no concierge floors, no serviced-apartment overlay. For buyers, that translates to a quieter, owner-occupier atmosphere rather than a high-turnover short-let environment.

# Connectivity and the surrounding district

Dubai International Airport sits 11.6 kilometres away, making the building practical for frequent travellers. Dubai Festival City Mall is 5.6 kilometres out, covering day-to-day retail and dining. Deira International School is 6.7 kilometres away, relevant for families with school-age children.

The broader Creek Harbour masterplan includes a dedicated metro station currently in the infrastructure pipeline, which will sharpen connectivity to the rest of the city considerably once operational. For now, the road network via Al Khail Road and the Ras Al Khor interchange handles most commutes efficiently.

Dubai Creek Harbour Park, at 3.2 kilometres, is the nearest large green space.

# What Grove Creek Beach represents for buyers considering Creek Harbour

Grove Creek Beach is a completed, fully sold asset in a district that is still actively delivering inventory. For buyers exploring the secondary market, that status matters: there is no construction risk, no handover uncertainty, and the service charge structure is already confirmed and operational.

The project suits owner-occupiers who want beachfront access within a walkable, lower-density neighbourhood without committing to Palm Jumeirah prices or the density of JBR. It also draws investors tracking rental demand in Creek Harbour, where proximity to the beach and to the eventual metro station underpins long-term yield prospects. The absence of furnishing keeps entry costs cleaner for buyers who intend to specify the interior themselves.

Structure

Payment plan

Payment plan
  1. Phase 1
    30%
    On booking
  2. Phase 2
    40%
    During construction
  3. Phase 3
    30%
    Upon Handover
Calculator

Payment plan worked out

Enter a target price to see how the payment stages land against your budget.

Stage%AED
On booking30%AED 0
During construction40%AED 0
Upon Handover30%AED 0
Total100%AED 0
Discuss this plan with an advisor

Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.

Lifestyle

Amenities

Community Pool & Kids Pool
Direct Beach Access
Fully-Equipped Gym
Outdoor Play Area
Roof Top Terraces
Inner Plaza
Setting

Location

Set in Dubai Creek Harbour, Dubai. Explore more in our Dubai Creek Harbour guide.

Nearby
  • Deira International School6.7 km
  • Dubai Festival City Mall5.6 km
  • Jumeira Public Beach16.9 km
  • Dubai International Airport11.6 km
  • Downtown Dubai13 km
  • Dubai Creek Harbour Park3.2 km

Distances and times shown are approximate, computed against generalised landmark coordinates and typical traffic conditions. Use them as a guide; actual commute time depends on building exit, district routing and time of day.

Resources

Documents

Escrow number
019000053581
Service charge
22-23 AED/sqft
Furnishing
Unfurnished
Construction start
2024-04-29
Construction end
2025-06-30
0
Buildings
1
Readiness
100%
Buildings
  • Building 1-5

    1, 2 and 3 bedroom apartments & 4 bedroom penthouses

Parking
  • 3 BR Apartment2 spaces
  • 2 BR Apartment1 space
  • 1 BR Apartment1 space
Questions

Frequently asked

Who is the developer of Grove Creek Beach?+

Emaar

Where is Grove Creek Beach located?+

Grove Creek Beach is located in Dubai Creek Harbour, Dubai, United Arab Emirates.

When is Grove Creek Beach handing over?+

Handover is scheduled for JUN 2025; the project is 100% complete.

What is the price of Grove Creek Beach?+

Prices at Grove Creek Beach start from AED 0.

Is Grove Creek Beach registered with escrow?+

Yes, Grove Creek Beach has escrow number 019000053581 with the Dubai Land Department.

Enquire about Grove Creek Beach

Request brochure, availability or a viewing.

A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Grove Creek Beach.

By sending this enquiry you agree to be contacted by a JRE advisor. See our privacy policy.