Film
- From
- AED 10,746,494
- Status
- On sale
- Handover
- Q2 2028
- Size
- 4,885–11,250 sqft
- Residences
- 81
- Construction
- 0% complete
- Furnishing
- Semi-furnished
- Service charge
- 4 AED/sqft
Sobha Siniya Island Villas, Phases 1 and 2, sits on Siniya Island in Umm Al Quwain, a protected natural reserve on the UAE's northern coast. The developer is Sobha, and the product is a collection of 81 standalone villas across four, five and six-bedroom configurations, with handover scheduled for June 2028.
# An Island Setting in Umm Al Quwain
Siniya Island occupies a stretch of the Arabian Gulf coastline positioned between Ajman and Ras Al Khaimah, within an emirate historically defined by mangrove forests, wetlands and low-density living. Umm Al Quwain is among the quietest of the seven emirates, and that is the point. The island is a protected reserve, known for wildlife including Arabian gazelles, and the decision to build here reflects a deliberate shift in the Dubai-adjacent luxury market toward natural environments rather than manufactured ones.
The project spans 81 villas across two phases. Construction is underway, with completion at zero per cent recorded at the time of publication, meaning buyers are entering at an early stage of delivery. Service charges are set at 4 AED per square foot.
# Residences, Layouts and Scale
Floor plans run from approximately 4,885 square feet for the four-bedroom villas up to 11,250 square feet for the largest six-bedroom mansions. These are substantial footprints. The four-bedroom villas open from around AED 10.7 million, with five-bedroom options ranging from roughly AED 17 million to just over AED 20.8 million, and six-bedroom homes reaching AED 28.1 million at the top of the range.
All residences are described as semi-furnished, with fully fitted kitchens and bathrooms. Each villa includes a private swimming pool.
The six-bedroom category is particularly notable for its scale. At 11,250 square feet, these properties sit comfortably in mansion territory, and pricing in the AED 23 to 28 million band reflects that positioning within the northern emirates rather than central Dubai, where comparable square footage would command considerably more.
# Amenities on the Island
The amenity package is compact but deliberately composed for a coastal lifestyle. Each villa carries its own private pool and private beach access. Shared infrastructure includes an 18-hole golf course and a retail boulevard.
The golf course extends the appeal to buyers for whom proximity to a quality course is a residential filter rather than an afterthought. The retail boulevard adds a degree of self-sufficiency to what is otherwise an island environment.
# Distance, Access and the Surrounding Area
Siniya Island sits immediately adjacent to Al Seaneeah, less than 100 metres away. Dreamland Aqua Park is 5.8 kilometres from the development. City Mall is 14.4 kilometres out, and The English Private School is approximately 19.6 kilometres away, relevant for families with school-age children.
The furthest reference point in the proximity data is Ras Al Khaimah International Airport at 52.4 kilometres, which connects residents to international routes without routing through central Dubai. Dubai International Airport is reachable by road, though the drive time will depend on traffic on Sheikh Mohammed Bin Zayed Road.
Umm Al Quwain's road connectivity to Abu Dhabi and Dubai makes the northern coast increasingly viable for buyers who do not require a city-centre address five days a week.
# The Buyer Case for a Northern Emirates Villa at This Scale
The Siniya Island villas address a specific profile: an international or GCC-based buyer who wants significant square footage, a natural coastal setting and distance from the density of Dubai Marina or Downtown, but with access to the UAE road network and its broader infrastructure.
Pricing between AED 10.7 million and AED 28.1 million places this below comparable villa product in Palm Jumeirah or Emirates Hills on a headline basis, while offering private beach frontage and island surroundings that most Dubai-proper addresses cannot provide. For buyers from the UK, Europe or Asia relocating to the UAE, or acquiring a second home in the region, the northern coast has historically been underweighted in property searches relative to its physical qualities.
Sobha brings an established delivery record to the project, which matters at this price point and this stage of construction. The June 2028 completion date gives buyers a reasonable planning horizon, though as with any under-construction purchase, the early entry position carries corresponding development risk.
Gallery
Project videos
Supporting films, shorts and lifestyle clips from the developer's official channel. Tap any tile to open the full embed.
Residences
10 unit configurations available at Sobha Siniya Island Villas Phases 1 and 2.
- Size
- 5,242
- Price
- AED 11,532,928–AED 12,858,161
- Size
- 4,885
- Price
- AED 10,746,494
- Size
- 5,242
- Price
- AED 11,532,928
- Size
- 4,885
- Price
- AED 10,746,494–AED 11,234,971
- Size
- 7,388
- Price
- AED 17,730,216–AED 18,099,595
- Size
- 7,226
- Price
- AED 17,704,043
- Size
- 7,388
- Price
- AED 16,991,457–AED 19,220,964
- Size
- 7,226
- Price
- AED 17,342,736–AED 20,872,279
- Size
- 9,740
- Price
- AED 23,375,592
- Size
- 11,250
- Price
- AED 26,999,496–AED 28,124,474
Payment plan
- Phase 110%On booking
- Phase 250%During construction
- Phase 340%Upon Handover
Payment plan worked out
Enter a target price to see how the payment stages land against your budget.
| Stage | % | AED |
|---|---|---|
| On booking | 10% | AED 1,074,649 |
| During construction | 50% | AED 5,373,247 |
| Upon Handover | 40% | AED 4,298,598 |
| Total | 100% | AED 10,746,494 |
Indicative only. Your advisor will confirm the final numbers, including 4% DLD, trustee, admin, mortgage and developer-level charges.
Amenities




- Dreamland Aqua Park5.8 km
- The English Private School19.6 km
- Ras Al Khaimah International Airport52.4 km
- City Mall14.4 km
- Al Seaneeah0.1 km
Distances and times shown are approximate, computed against generalised landmark coordinates and typical traffic conditions. Use them as a guide; actual commute time depends on building exit, district routing and time of day.
Documents
- Service charge
- 4 AED/sqft
- Furnishing
- Semi-furnished
- Construction start
- 2024-07-26
- Construction end
- 2028-06-30
- Residences
- 81
- Buildings
- 1
- Readiness
- 0%
- Villas
4, 5, 6 & 7 bedroom villas with pool
- 4 BR Villas2 spaces
- 7 BR Villas2 spaces
- 5 BR Apartment2 spaces
- 6 BR Apartment2 spaces
Frequently asked
Who is the developer of Sobha Siniya Island Villas Phases 1 and 2?+
Sobha
Where is Sobha Siniya Island Villas Phases 1 and 2 located?+
Sobha Siniya Island Villas Phases 1 and 2 is located in Siniya Island, .
When is Sobha Siniya Island Villas Phases 1 and 2 handing over?+
Handover is scheduled for Q2 2028; the project is 0% complete.
What is the price of Sobha Siniya Island Villas Phases 1 and 2?+
Prices at Sobha Siniya Island Villas Phases 1 and 2 currently range from AED 10,746,494 to AED 28,124,475.
Is Sobha Siniya Island Villas Phases 1 and 2 registered with escrow?+
JRE will confirm escrow registration on request.
Related residences
Request brochure, availability or a viewing.
A JRE advisor will respond within one business hour with the current brochure, floor plans, unit availability and payment plan for Sobha Siniya Island Villas Phases 1 and 2.






